Phase 4 -- Re-shape the topologies against the phase 2 data

Part of PLAN-ci-cloud-sizing.md. Phase 3 (PLAN-ci-cloud-sizing-phase-03-saturation-coverage.md) gated this phase and is Complete, so the gate is open.

Planning effort: high. The master plan asks for a decision about what the clouds should be, and the survey below found the arithmetic the master plan reasons from is attributed to a mechanism which does not exist in the tree. That has to be settled before a shape is chosen, not after.

Scope

In scope:

  • Establishing why two of slim-tier's three hypervisors and one of slim-primary's five publish cpu_schedulable 1 rather than 2. This is new work the master plan did not anticipate needing, and D1 makes it a gate rather than a step.
  • Choosing a shape for slim-primary and slim-tier against the phase 2 data and the phase 3 merge-run evidence, and applying it to the three topology files in shakenfist/actions.
  • Revisiting slim-tier's 70-minute job timeout, which exists because the tier is small.
  • Re-reading the candidate-shapes table's arithmetic against what the survey found, and correcting it at source.

Out of scope, explicitly:

  • Changing NODE_CPU_RESERVATION_THREADS, CPU_OVERCOMMIT_RATIO or SCHEDULER_TARGET_LOAD, in CI or anywhere. This phase changes the shape of the clouds, not the admission policy applied to them. D1 exists precisely so that a surprising reading is explained rather than tuned away, and the master plan's D1 keeps the production reservation in CI deliberately.
  • The demand bound itself. Phase 3's merge run found every guard refusal in the window falling on it (F3 below). Rescaling or disabling the D13 guard for small nodes is listed as fix (4) in the #3772 research and belongs to PLAN-transient-capacity-refusals.md, not here. This phase only has to predict what the reshape does to that bound, and measure it afterwards.
  • Adding or removing a topology, including creating the ci-topology-slim-tier-released.yml that F4 found does not exist. Its absence is a gap in release coverage, but closing it costs a sixth cloud per run and is a separate decision.
  • The sf-absent phantom. It stays exactly as it is. Its own comment block says so in capitals, and F4 records that it lives in only one of the two slim-primary files -- which is also left alone.
  • Fixing whatever F2 turns out to be, if it is a defect in the resources daemon rather than a property of the CI guests. The plan's job there is to record it and file an issue.

What the survey found

The master plan's phase 4 section was written in August. Six of its factual claims are wrong or incomplete, and one of them is the premise the whole phase rests on. Corrected at source in the master plan's phase 4 section and the docs/plans/index.md row as part of the planning commit, so a later step does not redo it.

F1 -- The ledger numbers are right, and now measured

Phase 3's first merge run publishes per-node ledgers directly, so this is no longer inferred. Run 34681505274, Committed vCPU, per node:

Topology Per-node ledgers Total Nodes at peak frac 1.000
slim-tier (Debian 12 tier) 3, 3, 6 12 two of three
slim-primary (Ubuntu 24.04 cluster) 3, 6, 6, 6, 6 27 one of five

The candidate-shapes table's Ledger column (slim-primary 27, slim-tier ~12) is confirmed exactly, and so is the phase 4 section's claim that the binding number is per node: slim-tier's cluster p90 committed/ledger was 0.833 while its two small nodes sat at 1.000.

F2 -- ~~the stated cause of the ledger-3 nodes does not exist~~ WRONG, and corrected by 4a

This finding was mistaken, and the mistake is recorded rather than deleted because it is the reason this phase has a gate at all. See 4a -- what the gate found below for the truth: the infra-role reservation bump is real, it is 4 threads, and it lives in examples/_shared/site.yml:359-363 in this repository -- the deployment playbook CI actually runs (actions/tools/deploy-collection.sh:65). The master plan's original explanation was right.

What this finding got right: the measured ledgers (F1), that node_cpu_reservation_threads is 2 in deploy/collection/roles/node/defaults/main.yml:24, that nothing in the collection or in shakenfist/actions overrides it, and that the ledger-3 nodes correlate exactly with carrying an infra role.

What it got wrong, and why: it concluded from those greps that no 4 exists anywhere. The role default is only the fallback for a caller that does not set the variable, and CI's caller always sets it, so the value never appears in the role, the collection or the CI repository at all -- it is computed by the playbook and arrives as a caller-supplied fact. Two things in the tree actively encouraged the wrong conclusion: scheduler.py:213-214 states "there is no longer an infra-role bump", which is true of the synthetic fallback it annotates and false as a statement about the system; and config.py:610 described the templating as "folding in any historical infra-role bump", where "historical" reads as "since removed" rather than as "still applied, by the deployer". That second citation is worth being precise about, because getting it wrong is the same error in miniature: the phrase was in NODE_RAM_RESERVATION_GB, and config.py:614 is where NODE_CPU_RESERVATION_THREADS begins. It is the CPU value that produced the ledger-3 nodes, and its description said nothing about the bump at all. Both are corrected by this phase's commits.

The lesson for the rest of this plan, and for phase 5, and it is worse than "read one more file". The mechanism was already written down, in prose, in this project's own operator guide: docs/operator_guide/scheduler.md:117-128 says "There is no separate reservation added on nodes carrying a cluster-wide role... Instead, the Ansible deploy computes a per-host default ... that already accounts for a node's roles", and gives the formula as (1 + 1 if network/database else 0) * 2 threads. That paragraph answers the entire gate question, and it shipped before this plan was written.

So the survey did not fail for want of a third file to grep. It failed by reaching for grep at all on a question about how a node is configured, which is a documented behaviour rather than a string. The order phase 5 inherits is: read the operator guide for the subsystem first, then examples/_shared/site.yml (the playbook CI actually deploys with, which is neither the product nor the CI harness), then the collection. A grep over the collection and the CI repository is last, and it is a check rather than a survey.

D1's gate therefore rested on a false premise, and was still worth running -- not because the reshape was in doubt, but because the same step established the exact arithmetic D3 needs, found that 6 vCPU only brings an infra node up to where a plain hypervisor already sits, and turned up the silent-clamp defect below. That is a weaker justification than the one D1 was written with, and D1 says so now.

F3 -- The bound that refused placements is not the one being resized

Phase 3's close-out recorded this and it bears directly here. In the same run, every capacity-guard refusal on all three cluster jobs fell on the demand dimension alone -- 176, 139 and 163 of them -- and none on an allocation dimension. The attribution inverts with size: measured load alone was already over the bound in 138 of 176 refusals (78%) on the three-node job, where the D13 feedforward estimate carried roughly two thirds on the five-hypervisor ones.

The demand bound is SCHEDULER_TARGET_LOAD (0.75, shakenfist/config.py:523) per schedulable thread, so it scales with the same cpu_schedulable the ledger does. On a ledger-3 node the bound is 0.75 of one thread, which is why that node refuses almost everything. A reshape that lifts those nodes to cpu_schedulable 4 lifts the bound to 3.0 -- a fourfold improvement, larger in proportional terms than the ledger gain.

So the reshape plausibly helps more than the master plan claims, but through a mechanism the master plan never mentions, and entirely conditional on F2. Both dimensions hang on the same unknown.

F4 -- Only one -released variant exists, and it differs structurally

The phase 4 section says "(and the -released variants)", plural. shakenfist/actions/ansible/ holds:

  • ci-topology-slim-primary.yml -- primary is not a hypervisor (groups: allsf,database_node,primary_node, :84); sf1 is the network node and a hypervisor; sf1-sf5 are the five hypervisors. Carries the sf-absent phantom (:29).
  • ci-topology-slim-tier.yml -- primary carries every role including hypervisors and network_node (:65); sf1 is a hypervisor and the second database node; sf2 is a plain hypervisor. No phantom.
  • ci-topology-slim-primary-released.yml -- primary is the network_node and is not in hypervisors (:62), which is a different shape from plain slim-primary where sf1 is the network node. No sf-absent phantom.

There is no ci-topology-slim-tier-released.yml. So the work is three files, not four or more, and the released variant is not a copy of the other -- a change applied mechanically to both would make slim-primary-released wrong.

F5 -- functional-tests.yml has no node lists, and is in the other repository

The phase 4 section asks for "updating any hardcoded node lists in functional-tests.yml", in a sentence otherwise about actions-repo topology files. That file is shakenfist/.github/workflows/functional-tests.yml and its merge matrix (:436-484) carries topology names, concurrency: 5 and per-job timeout_minutes -- no node names, no node counts, nothing a reshape invalidates.

There is one thing there worth changing, and it is not a node list: slim-tier runs at timeout_minutes: 70 against slim-primary's 60, with a comment (:471-474) saying it needs the headroom because it runs "the same cluster suite on roughly half slim-primary's hypervisor capacity". If the reshape works, that premise weakens and the timeout should come back down -- which is also a falsifiable way to tell whether the reshape worked.

F6 -- The structural minimums are real, and slim-tier is already at one

All three hold, with two corrections:

Requirement Where Correction
>=2 hypervisors that are not the network node cluster_ci_tests/test_network_lifecycle.py:53 slim-tier is exactly at this minimum today. Its primary is the network node, so sf1 and sf2 are the only two candidates. Any consolidation of the tier onto two hypervisors makes this test skip.
>=3 nodes cluster_ci_tests/test_scheduler.py:128 and :291 The guard counts get_nodes(), that is all nodes rather than hypervisors, and two tests carry it, not the one the master plan names -- test_affinity (the weighted-ordering test, :124) and test_binary_affinity_prefers_the_tagged_node (:282), whose docstring calls itself "the binary model's soft half, asserted the same way test_affinity asserts the weighted one". Both must be named wherever this phase says which tests must not skip.
>=2 database nodes cluster_ci_tests/test_database_tier.py:37 As stated.

F7 -- Every file this phase edits is in a repository only the operator can push

All three topology files are in shakenfist/actions. Phase 3 met this seam at 3e and it cost the phase a day of being un-closeable. Phase 4 is entirely that, plus the one timeout in this repository. D6 deals with it rather than discovering it late.

F8 -- The candidate-shapes table needs re-reading, not replacing

Its vCPU column counts every under-cloud instance, including slim-primary's primary, which F4 shows is not a hypervisor and therefore contributes no ledger at all. "primary as 4 x 5 vCPU plus a database node" is a change to sf1-sf5's count and size with the primary left alone, not a change to the primary. The Ledger column is right (F1) and the shapes remain the right menu; the reader just has to know which column is scheduling capacity and which is under-cloud spend.

4a -- what the gate found

The mechanism exists, F2 was looking in the wrong repository, and the master plan's original arithmetic was right all along. NODE_CPU_RESERVATION_THREADS really is 4 on the infra nodes. It is not in the collection and not in shakenfist/actions; it is computed by the deployment playbook in this repository, at examples/_shared/site.yml:359-363:

- name: Default the per-host CPU thread reservation
  ansible.builtin.set_fact:
    node_cpu_reservation_threads: >-
      {{ (1 + ((node_is_network_node or node_is_database_node) | ternary(1, 0))) * 2 }}
  when: node_cpu_reservation_threads is not defined

The infra-role bump was not removed. It was moved -- out of the server and into the deployer -- which is exactly what config.py:614's "folding in any historical infra-role bump" is describing, and what scheduler.py:213-214's "there is no longer an infra-role bump" means (it is a statement about the scheduler's synthetic fallback only, covered by test_old_dialect_fallback_ignores_infra_role). F2's grep of the collection role and of shakenfist/actions could not find it because the value reaches the role as a caller-supplied variable; roles/node/defaults/main.yml:24's 2 is only the fallback for a caller that does not set it, and CI's caller always sets it (actions/tools/deploy-collection.sh:65 runs examples/_shared/site.yml).

Proven from the run-34681505274 bundles, the rendered /etc/sf/config of every node:

Topology Node Roles ..._CPU_RESERVATION_THREADS cpu_schedulable Ledger
slim-tier primary hyp, network, database 4 1 3
slim-tier sf1 hyp, database 4 1 3
slim-tier sf2 hyp 2 2 6
slim-primary primary database (not hyp) 4 n/a n/a
slim-primary sf1 hyp, network 4 1 3
slim-primary sf2-sf5 hyp 2 2 6

So on the infra nodes cpu_schedulable = max(1, 4 - 4) = max(1, 0) = 1 -- the degenerate case that test_schedulable_floors_at_one exists to cover -- and limit_cpus = floor(1 x 3.0) = 3. On the plain hypervisors max(1, 4 - 2) = 2 and floor(2 x 3.0) = 6. Nothing is guessing, nothing is stale and nothing is on the scheduler's fallback: cpu_schedulable is published and truthy on all five nodes in all 237 samples across the two series, cpu_committed_row_present is true throughout, and _get_hybrid_core_counts() (shakenfist/daemons/resources/main.py:72-99) returns only cpu_cores_performance / cpu_cores_efficiency so it cannot overwrite cpu_schedulable, cpu_threads or cpu_cores. psutil sees a perfectly ordinary 4-thread guest; the cross-check is that all three slim-tier nodes publish ram_max 35880 = 11960 x RAM_OVERCOMMIT_RATIO 3.0, so they are identically sized and only the reservation differs.

The RAM reservation is clamped on the same nodes, for the same reason. site.yml:352-357 gives infra nodes max(2.0, 10% of RAM) + 4.0 = 6.0 GB, and _compute_reservations() caps a reservation at half the machine (shakenfist/daemons/resources/main.py:119-120), so the published memory_reserved_mb is 5980 = 11960 // 2 rather than 6144. Both of the production reservations are saturating their safety clamps on these guests. A 4 vCPU / 12 GB guest is simply too small to carry an infra role at production reservation values: the bump assumes a node where 4 threads and 6 GB are a modest slice, and on this guest they are 100% of the CPU and 51% of the RAM.

Answer to the question the phase turns on: yes, growing the guest raises cpu_schedulable, linearly, because the reservation is absolute and does not scale with the guest. The bump is a fixed 4 threads whatever the node's size, so:

Guest vCPU Infra node (res 4) Plain hypervisor (res 2)
4 (today) sched 1, ledger 3 sched 2, ledger 6
6 sched 2, ledger 6 sched 4, ledger 12
8 sched 4, ledger 12 sched 6, ledger 18

Two consequences for D3 and D4, which are for the operator to rule on:

  1. D3's three 6 vCPU slim-tier nodes give ledgers 6, 6, 12 (24 total, up from 12), not 6, 6, 6. The infra nodes double, and the plain node quadruples as a side effect of the uniform size.
  2. Six vCPU only lifts the infra nodes to where today's plain hypervisors already sit. If the intent is that no hypervisor is materially smaller than another, the infra nodes need 8 vCPU to reach a ledger of 12, or the topology needs a per-host node_cpu_reservation_threads in inventory -- which the playbook explicitly supports (when: ... is not defined) but which would be a deliberate departure from production values and therefore a D1 question, not a free choice.

Is it a defect? The arithmetic is correct behaviour, and the correlation with roles is a property of the deployment playbook rather than of the CI under-cloud. Two small real defects fall out, neither of which this phase fixes:

  • shakenfist/scheduler.py:213-214 asserts "there is no longer an infra-role bump". True of the fallback it is commented on, false as a statement about the system, and it is what sent F2 looking in the wrong place. Worth narrowing to "the synthetic fallback no longer applies a role-aware bump; the deployer does, per host".
  • A node whose reservation meets or exceeds its thread count is rescued silently by max(1, ...), and a node whose RAM reservation exceeds half the machine is rescued silently by the // 2 cap. Nothing logs, events or publishes a flag when either clamp engages, so a node reserving 100% of its CPU looks indistinguishable from a node with one spare thread. Had either clamp emitted an audit event, this gate would have been a single /admin/resources read. Filed as #4201, whose body says explicitly that the clamps themselves are the right failure mode and must not be removed, that the CI reservation must not be lowered to dodge them, and that the scheduler must not be made to tolerate a zero ledger -- the defect is that they are quiet. Out of scope here by this plan's Scope section.

Decisions

D1 -- F2 was a gate, and it has been discharged

Status: closed by 4a on 2026-09-13, and the premise it rested on was wrong. The gate said no topology file could be edited until the mechanism behind cpu_schedulable 1 was established. 4a established it: the infra-role reservation bump is real, is 4 threads, and lives at examples/_shared/site.yml:359-363. The master plan's original explanation was correct and F2's contradiction of it was a bad survey, so the question the gate existed to answer did not actually need asking.

The record stays rather than being tidied away, because the honest account of the cost is useful. The gate was justified on "the cited cause is demonstrably absent from the tree", which was false. It was worth running anyway, for three things that were not in the plan before it: the exact per-guest-size arithmetic D3 now uses; the finding that 6 vCPU lifts an infra node only to where a plain hypervisor already sits, which changes the shape question; and the silent-clamp defect. But "the gate paid for itself" is not the same claim as "the gate was correctly motivated", and only the first is true here.

What a reviewer should take from it, and it is less flattering than the first draft of this paragraph: the check that would have avoided the whole detour was not reading one more file, it was reading docs/operator_guide/scheduler.md:117-128, which documents the per-host role bump and its exact formula and which this project shipped before this plan existed. A high-effort opus step and a gate were spent on a question our own operator guide answers in a paragraph. F2 now says so, and phase 5 inherits the ordering rather than the playbook-only rule.

D2 -- Land slim-tier first, and alone

The master plan says "land one topology at a time so a regression is attributable". It is silent on order. slim-tier goes first because it is where the evidence is strongest (two of three nodes pinned at 1.000, a 19% historic pass rate, and the smaller blast radius of one job rather than three), and because at 3 x 6 vCPU it is the cheapest shape in the table that changes anything: +6 vCPU, no extra RAM.

D3 -- slim-tier becomes three 6 vCPU nodes, and the case for 8 is real

Of the menu, three 6 vCPU nodes is the smallest shape that raises the infra hypervisors rather than only the total, which is the master plan's own criterion. With 4a's arithmetic the predicted per-node ledgers are 6 / 6 / 12 for a total of 24, doubling the tier: the two infra nodes go max(1, 6-4) = 2 so floor(2 x 3) = 6, and the plain node goes max(1, 6-2) = 4 so floor(4 x 3) = 12. The plain node gains proportionally more, which the candidate table's flat "Ledger 24" does not show.

The argument against, which 4a surfaced and which a reviewer may prefer: 6 vCPU only lifts an infra hypervisor to a ledger of 6, which is exactly where a plain hypervisor sits today. If the goal is that no hypervisor is materially smaller than its siblings -- and the master plan's criterion is that any shape leaving an infra hypervisor small "leaves the failure in place" -- then 8 vCPU is the shape that delivers it: ledgers 12 / 12 / 18, and a SCHEDULER_TARGET_LOAD bound of 3.0 rather than 1.5 on the nodes that refuse.

This decision stays at 6 for now, for three reasons, and it is the decision in this plan most likely to be argued with. First, and strongest because it is not this plan's own judgement: phase 0's D2 already fixed the criterion, and it was parity rather than sufficiency -- slim-tier is "sized for a ledger comparable to the other cluster topologies" (phase 0, D2). Three 6 vCPU nodes give a cluster ledger of 24 against slim-primary's measured 27, which is comparable; three 8 vCPU nodes give 42, which is not parity with anything in the fleet but a 55% overshoot of the topology it is meant to match. The master plan's candidate-shapes table already carries both numbers and they reconcile exactly with 4a's arithmetic. Choosing 8 is therefore not just a bigger number, it is a decision to revisit D2, and it should be argued as that. Second, cost: 8 vCPU is +12 vCPU per tier cloud against 6's +6, on an under-cloud the master plan's The under-cloud budget this spends section treats as the binding resource. Second, evidence: the measured p90 is 10 committed vCPU against a ledger of 12, so 24 already leaves real headroom, and the refusals in phase 3's window were on the demand bound (F3), where 6 vCPU already triples the infra nodes' bound from 0.75 to 1.5. If 4d's merge runs show demand refusals persisting at 6 vCPU, the answer is 8 -- and D3 and phase 0's D2 should be revised then, together and on evidence, rather than guessed at now.

A third option exists and is deliberately not taken: setting node_cpu_reservation_threads per host in the CI inventory, which examples/_shared/site.yml:363's when: ... is not defined explicitly supports. That would raise the infra nodes' ledger without buying any vCPU at all. It is rejected because it departs from production reservation values in CI, which the master plan's D1 keeps deliberately -- the clouds are meant to admit the way a real cluster admits.

It is also not as cheap as it first looks, which the master plan's open question 1 already records and this paragraph originally left out: CI's inventory is generated by tools/ci-make-inventory.py in shakenfist/actions, whose render_node_vars() emits a fixed block with no hook for arbitrary host vars, so the override needs either a generator change or a cluster-wide --extra-vars -- and a cluster-wide value cannot express "only the infra nodes", which is the whole point of the option. It is recorded here because it is still the option that buys no vCPU at all, and a reviewer should see that it was considered and why it lost.

Node count stays at three, which F6 shows is forced: two would break both test_network_lifecycle and the two >=3 nodes scheduler tests, and the tier's purpose is its two database nodes.

D4 -- slim-primary is a separate step, and may not happen in this phase

It has one ledger-3 node out of five, a cluster p90 fraction well below the tier's, and it is three of the four cluster jobs. Its shape choice should be made against what landing slim-tier actually showed, not against the same table read twice. 4e therefore decides whether to reshape slim-primary and records the reasoning either way; a documented "not yet, and here is the evidence" is a valid outcome of this phase.

D5 -- The slim-tier timeout comes down in a later step, not the same one

Dropping timeout_minutes from 70 to 60 in the same change as the reshape would make a timeout failure ambiguous between "the reshape did not help" and "the timeout was cut too early". 4f does it after at least five merge runs on the new shape, and only if the observed wall-clock supports it.

D6 -- The topology changes are prepared as a reviewable diff in this repository

F7 means this phase cannot push its own central change. Rather than repeat 3e's shape -- work sitting uncommitted in another checkout, blocking a Definition of done item for a day -- each actions-repo change is written into this plan file as a complete diff under a Prepared changes heading, with the operator applying it. The plan is then self-contained and reviewable here, and the actions-repo commit is a transcription rather than a re-derivation.

D7 -- The phase measures itself against the phase 1 instrument

The falsifiable question is not "is the YAML changed" but "did the ledger move and did the refusals stop". Both are already published per run by the headroom probe (Committed vCPU, per node) and the census (Capacity guard census), so every done-criterion about effect reads those sections rather than inventing a measurement. This is also what makes F3 checkable: if the demand refusals do not fall after the reshape, the reshape did not address what was refusing.

Step plan

Step Effort Model Isolation Brief for sub-agent
4a high opus none Gate (D1). Establish why some CI hypervisors publish cpu_schedulable 1. Read _compute_reservations() at shakenfist/daemons/resources/main.py:102-129 and its caller at :255-271; the value is max(1, cpu_threads - cpu_reservation_threads) where cpu_threads is psutil.cpu_count(logical=True) inside the guest and the reservation is 2 everywhere (F2 lists every definition site). Then establish what the ledger-3 nodes actually report. Cheapest route first: read /admin/resources and GET /nodes from a live CI cluster, or the node metrics row, for a node known to be at ledger 3 -- slim-tier's primary or sf1 -- and compare cpu_threads, cpu_cores, cpu_max and cpu_schedulable against a ledger-6 node like slim-tier's sf2. Note that _get_hybrid_core_counts() runs retval.update() after _compute_reservations() at :271, so check whether it can overwrite any of these keys. Also check whether cpu_schedulable_from_fallback is set for those nodes (shakenfist/scheduler.py:216-224, :383, :940), because the fallback path approximates from cpu_max instead and a node taking it is answering a different question. Do not change any configuration value (Scope). Report the mechanism, whether a larger guest raises it, and if the cause is a defect, file an issue and record the number here.
4b medium sonnet none Correct the master plan's phase 4 section against F1-F8: replace the NODE_CPU_RESERVATION_THREADS=4 explanation with what 4a found, fix "(and the -released variants)" to name the one that exists, move the functional-tests.yml sentence out of the actions-repo list and restate it as the timeout question, note that slim-primary's primary is not a hypervisor so the candidate table's vCPU column is under-cloud spend rather than scheduling capacity, and correct the structural-minimum row to name both >=3 nodes tests and to say slim-tier already sits at the test_network_lifecycle minimum. Cite file and line for each. Do not restate F2's reasoning at length -- link to this plan.
4c high opus none Decide and prepare the slim-tier reshape (D2, D3, D6). Write the complete diff for shakenfist/actions/ansible/ci-topology-slim-tier.yml taking all three nodes from cpu: 4 to cpu: 6, leaving ram: 12288 and every groups: line untouched, into a Prepared changes section of this plan. The three instance blocks are at :35, :72 and :102. State the predicted per-node ledgers and the predicted SCHEDULER_TARGET_LOAD bound per node, both derived from what 4a established rather than from F2's guess, so the first merge run can falsify the prediction. If 4a found a larger guest does not raise cpu_schedulable on those nodes, do not write the diff: record why the reshape would not work and what would.
4d medium sonnet none After the operator applies 4c, read the first three merge runs on the new slim-tier and record, in this plan's Outcome: per-node ledgers from Committed vCPU, per node; the guard refusal count and dimension split from Capacity guard census; whether any sufficient_idle_cpu stage abort remains; and whether test_network_lifecycle, test_affinity, test_binary_affinity_prefers_the_tagged_node and test_database_tier still run rather than skip (F6 -- there are two >=3 nodes scheduler tests, at test_scheduler.py:128 and :291, not one). Compare against 4c's predictions explicitly and say which were wrong.
4e high opus none Decide slim-primary (D4). With 4d's evidence, choose between the two slim-primary candidate shapes, a smaller change, or none. If reshaping, prepare diffs for both ci-topology-slim-primary.yml and ci-topology-slim-primary-released.yml, which F4 shows are not structurally identical -- the released variant's primary is the network node and is not a hypervisor, so a mechanically copied diff would be wrong -- and leave the sf-absent phantom block untouched in the file that has it. If not reshaping, record the evidence for not doing so; that is a valid outcome.
4f low sonnet none Only after five merge runs on the reshaped tier, and only if wall-clock supports it (D5). Drop timeout_minutes from 70 to 60 for the Debian 12 tier matrix entry in .github/workflows/functional-tests.yml:482, and rewrite the comment at :471-474 which currently explains the bump by the tier having half slim-primary's capacity. Record the observed run durations that justify it. If they do not, leave it and say so.
4g medium sonnet none Close-out: set this phase Complete in the master plan's Execution table and the docs/plans/index.md row (4 of 8 becomes 5 of 8), write What phase 5 inherits, run python3 tools/check-plan-status.py and pre-commit run --all-files, and confirm every Definition of done item by running it rather than reading it.

4a gates everything. 4b can run in parallel with 4a only for the claims 4a does not touch (F4, F5, F6, F8); the F2 correction waits. 4c needs 4a. 4d needs 4c applied and a merge run. 4e needs 4d. 4f needs five runs after 4c. 4g is last.

Prepared changes

slim-tier: three 4 vCPU nodes become three 6 vCPU nodes

Prepared by 4c under D6, because F7 means this phase cannot push the change itself. Repository: shakenfist/actions -- not this one -- file: ansible/ci-topology-slim-tier.yml. Three lines change, one cpu: value per sf_instance block, and nothing else: ram: 12288 and every groups: line are deliberately untouched, because the role assignments are what make primary and sf-1 infra nodes and F6 records that the tier is already exactly at test_network_lifecycle's minimum of two hypervisors that are not the network node.

--- a/ansible/ci-topology-slim-tier.yml
+++ b/ansible/ci-topology-slim-tier.yml
@@ -35,7 +35,7 @@
     - name: Create a primary instance
       shakenfist.shakenfist.sf_instance:
         name: "t-{{instance_suffix}}-primary"
-        cpu: 4
+        cpu: 6
         ram: 12288
         disks:
           - "100@{{base_image}}"
@@ -72,7 +72,7 @@
     - name: Create sf-1
       shakenfist.shakenfist.sf_instance:
         name: "t-{{instance_suffix}}-1"
-        cpu: 4
+        cpu: 6
         ram: 12288
         disks:
           - "100@{{base_image}}"
@@ -102,7 +102,7 @@
     - name: Create sf-2
       shakenfist.shakenfist.sf_instance:
         name: "t-{{instance_suffix}}-2"
-        cpu: 4
+        cpu: 6
         ram: 12288
         disks:
           - "100@{{base_image}}"

Nothing else in the file scales with cpu. Both disks are fixed sizes (100@{{base_image}} and 60@sf://label/ci-images/dependencies), the two networkspecs entries are fixed addresses, and the remaining plays configure apt, pip, the mesh interface and the wheels. There is no flavour indirection to satisfy -- sf_instance takes cpu and ram directly.

Predictions, and the arithmetic they come from

Three formulae, each verified in this worktree as part of writing this section:

  • cpu_schedulable = max(1, cpu_threads - cpu_reservation_threads), shakenfist/daemons/resources/main.py:126. cpu_threads is psutil.cpu_count(logical=True) inside the guest, so it is the under-cloud instance's cpu.
  • limit_cpus = floor(cpu_schedulable * CPU_OVERCOMMIT_RATIO), shakenfist/mariadb.py:24596, with the ratio defaulting to 3.0 at shakenfist/config.py:568.
  • The demand bound is SCHEDULER_TARGET_LOAD * cpu_schedulable, with the target defaulting to 0.75 at shakenfist/config.py:523. The guarded comparison is cpu_load_1 + expected_demand <= target_load * cpu_schedulable in _demand_guard_clause() (shakenfist/mariadb.py:26024-26078, the clause at :26076-26077).

The reservation itself is (1 + ((network or database) ? 1 : 0)) * 2 at examples/_shared/site.yml:359-363 per 4a, so 4 threads on primary and sf-1 and 2 on sf-2, and it is absolute: it does not move when the guest grows.

Node Roles Reserved threads cpu_schedulable before -> after limit_cpus (ledger) before -> after Demand bound before -> after
primary hypervisor, network, database 4 1 -> 2 3 -> 6 0.75 -> 1.50
sf-1 hypervisor, database 4 1 -> 2 3 -> 6 0.75 -> 1.50
sf-2 hypervisor 2 2 -> 4 6 -> 12 1.50 -> 3.00

The "before" column is not a derivation: it is what run 34681505274 measured (F1: ledgers 3, 3, 6), so the model reproduces the observed state before it is used to predict the new one.

Cluster totals. Ledger 12 -> 24, schedulable threads 4 -> 8, summed demand bound 3.00 -> 6.00. Under-cloud spend rises from 12 to 18 vCPU for the tier cloud, with RAM unchanged at 3 x 12288 MiB.

What 4d should see. In the first merge run on the new shape, the headroom probe's Committed vCPU, per node section should report per-node ledgers of 6, 6 and 12 for a cluster total of 24, where the same section reported 3, 3 and 6 for a total of 12.

One under-cloud side effect to be aware of, since it is a consequence of changing cpu specifically and not of the tier getting bigger: each of these three under-cloud instances now draws 6 rather than 4 vCPU from its under-cloud hypervisor's ledger, and the under-cloud's own feedforward term demand_add = cpus * SCHEDULER_DEMAND_PER_VCPU (0.6, shakenfist/config.py:532-533) rises from 2.4 to 3.6 per instance. That makes an under-cloud 507 on creating the tier marginally more likely, which is the #3772 family rather than anything this phase introduces, and it would show up as an ansible failure in the Create a primary instance / Create sf-1 / Create sf-2 tasks rather than as a test failure.

How this prediction is falsified

Three distinguishable readings of the first merge run after the diff is applied, which point at three different next actions:

  1. The model is wrong. Committed vCPU, per node reports anything other than 6, 6, 12 for the three slim-tier nodes -- in particular, primary and sf-1 still reporting a ledger of 3 while sf-2 moves to 12, which would mean the infra-role reservation is not the absolute 4 threads 4a measured but something that scales with guest size. Next action: re-read the rendered /etc/sf/config and the node_metrics row for primary, not buy more vCPU. The sharper single reading is cpu_schedulable itself: it must be 2 on primary and sf-1 and 4 on sf-2.
  2. The model is right and F3's bound is what binds. The ledgers read 6, 6, 12 and the Capacity guard census still shows refusals of the same order as the 176 / 139 / 163 in F3's window, still falling on the demand dimension alone. The reshape did what it predicted and was not enough; next action is D3's recorded revision to 8 vCPU (ledgers 12, 12, 18; bound 3.00 on the infra nodes) or the sibling plan's guard work, not a re-derivation of the arithmetic.
  3. The binding dimension moved. The ledgers read 6, 6, 12 and the census refusals shift off demand onto an allocation dimension (cpus, memory_mb or disk_gb), which F3 saw none of. That would be a genuinely new finding -- the tier would then be limited by the ledger or by RAM rather than by load -- and it is an argument about ram: 12288, which this diff deliberately does not touch.

A job that still fails while the ledgers read 6, 6, 12 is reading 2 or 3, not a falsification of this section on its own; the census dimension split is what separates them.

Operator checklist

D2 lands one topology at a time so a regression is attributable, and F7 means every step below happens in a repository this session cannot push to.

  1. In the shakenfist/actions checkout -- a separate repository with its own pull request, not this one -- branch off main.
  2. Apply the diff above to ansible/ci-topology-slim-tier.yml: three cpu: 4 lines become cpu: 6, at the primary, sf-1 and sf-2 sf_instance blocks (:35, :72, :102).
  3. Confirm the change is exactly three lines in one file: git diff --stat shows 1 file changed, 3 insertions(+), 3 deletions(-), and git diff | grep -E '^[+-] *(ram:|groups:)' prints nothing.
  4. Do not change ci-topology-slim-primary.yml or ci-topology-slim-primary-released.yml in this commit or this pull request. They are 4e's decision (D4), F4 records that they are not structurally identical to each other, and landing them together would make a regression unattributable.
  5. Open and merge the pull request in shakenfist/actions. Note that .github/workflows/functional-tests.yml calls shakenfist/actions/.github/workflows/smoke-cluster.yml@main, so there is no pin to bump here and the new shape is live for the very next PR and merge-queue run, including any already in flight -- merge it when the queue is quiet.
  6. Tell 4d which merge run is the first on the new shape, so it reads the right three runs.
  7. Leave timeout_minutes: 70 on the Debian 12 tier matrix entry alone (D5); 4f revisits it after five merge runs.

Risks and mitigations

Risk Mitigation Who checks
The reshape raises the four nodes that were never the problem and leaves the infra nodes at ledger 3, spending under-cloud capacity for nothing. D1's gate. 4a establishes the mechanism before any YAML changes, and 4c is instructed not to write a diff if a larger guest would not move those nodes. 4a, and the operator before applying 4c.
The reshape works on the ledger and the jobs still fail, because F3's demand bound is what actually refuses. 4c predicts the new SCHEDULER_TARGET_LOAD bound per node as well as the ledger, and 4d reads the census dimension split rather than only the pass/fail. If demand refusals persist at the new size, that is evidence for the sibling plan's guard work and against more vCPU, and it is recorded as such rather than answered with another resize. 4d.
Consolidating the tier breaks a structural minimum and a test starts skipping, so the topology looks greener because less is asserted. D3 fixes the node count at three, and 4d's done-criteria name the three tests by file and require that they ran, not that the job passed. F6 records that slim-tier is already at test_network_lifecycle's minimum, so there is no slack to spend. 4d.
A diff applied mechanically to both slim-primary files breaks the released variant, whose primary has a different role set. F4 records the difference and 4e's brief names it. The released variant also has no sf-absent phantom, so a copied block would introduce one. 4e, and the operator applying it.
The actions-repo changes sit unpushed and block close-out, as 3e did. D6: every actions-repo change is a complete diff inside this plan, reviewable here, with the operator transcribing. Nothing in this repository waits on it except 4d, which waits on a merge run anyway. The operator.
Dropping the timeout too early turns a capacity finding into a timeout failure. D5 separates the two changes by at least five merge runs and makes 4f conditional on observed duration. 4f.
4a finds a defect and the phase grows a bug fix. Out of scope by Scope; 4a files an issue and records the number. If the defect means reshaping cannot work, the phase's correct outcome is to say so, not to fix the daemon. 4a.

Definition of done

Falsifiable, in order:

  1. This plan records, with file and line references, the mechanism by which a CI hypervisor comes to publish cpu_schedulable 1, and states whether raising its guest cpu raises it. A reader can check the claim against the named code without re-deriving it. Met by 4a: examples/_shared/site.yml:359-363 and daemons/resources/main.py:126, with the per-guest-size table in D3.
  2. The master plan's phase 4 section attributes the ledger to the line that actually sets it, so a reader is not sent to the wrong repository as F2 was. grep -c 'examples/_shared/site.yml' docs/plans/PLAN-ci-cloud-sizing.md is at least 1, and grep -c 'is 2 everywhere' docs/plans/PLAN-ci-cloud-sizing.md is 0.
  3. The master plan's phase 4 section names exactly the topology files that exist. shakenfist/actions is a separate repository, so run this from here rather than expecting a local path: gh api repos/shakenfist/actions/contents/ansible --jq '.[].name' | grep ci-topology-slim- returns three entries matching slim-primary, slim-tier and slim-primary-released, and the section names those three and no others.
  4. The master plan's structural-minimum list names both tests that require three nodes, and grep -c 'len(nodes) < 3' shakenfist/deploy/shakenfist_ci/cluster_ci_tests/test_scheduler.py equals the number it claims.
  5. Either ci-topology-slim-tier.yml has three nodes at cpu: 6 and a merge run on it reports per-node ledgers of 6, 6 and 12, or this plan records why the reshape was not made with the 4a evidence that decided it. Not both, and not neither.
  6. If the tier was reshaped: a merge run after it shows test_network_lifecycle, test_affinity, test_binary_affinity_prefers_the_tagged_node and test_database_tier each reporting a verdict other than SKIPPED. All four, because F6 found the >=3 nodes guard on two tests rather than one and an earlier draft of this item named only the first of them. Read from the stestr output, not inferred from the job being green.
  7. If the tier was reshaped: this plan records the Capacity guard census refusal count and dimension split for three merge runs before and three after, and states whether the demand refusals fell. A reshape that doubled the ledger and did not move the refusals is a finding, and saying so satisfies this item.
  8. slim-primary's disposition is recorded either as an applied diff for both of its files or as a decision not to reshape with the evidence behind it. An unanswered slim-primary does not satisfy this.
  9. The slim-tier timeout_minutes is either 60 with the observed durations recorded, or still 70 with the reason recorded.
  10. No configuration default value changed. The check is not that the files are untouched -- this phase edits two Field descriptions in shakenfist/config.py, which is the point of one of its commits -- but that no default moved: git diff develop -- shakenfist/config.py | grep -E '^[+-] +[0-9]' is empty, and git diff develop -- shakenfist/deploy/collection/roles/node/defaults/main.yml is empty. The first draft of this item asked for the whole config.py diff to be empty, which this phase's own commits already falsified; 4g runs these items rather than reading them, so it would have stalled here.
  11. python3 tools/check-plan-status.py passes, and pre-commit run --all-files passes in the main repository.

Outcome

Complete. All seven steps have landed. The reshape was applied, measured against its predictions and closed out; slim-primary was answered with a decision not to reshape rather than with a deferral.

Step State
4a Done. Gate discharged, and it corrected F2 rather than the master plan. See 4a -- what the gate found. Filed #4201.
4b Done, though not as the step table specifies -- see the deviation below.
4c Done. The diff is in Prepared changes, with predictions, a three-way falsification statement and the operator's checklist.
4d Done. shakenfist/actions#88 merged as f78576e; six merge runs read. Ledgers are 6, 6, 12 as predicted, the allocation bound was relieved and the demand refusals did not move. See 4d -- what the merge runs measured.
4e Done. D4 answered: slim-primary is not reshaped, with the three-run evidence in 4e. No diff prepared for either of its files.
4f Done. timeout_minutes 70 -> 60 on the Debian 12 tier entry, with the comment rewritten and the six observed durations recorded.
4g Done. This close-out.

Deviation from the step plan, declared rather than buried. 4b is listed as a sonnet sub-agent step. It was done inline by the management session instead, because by the time it ran its content had changed: 4a had shown that the text 4b was meant to correct was text this plan's own survey had got wrong, and the correction touched the same three files the session was already holding open. Dispatching it would have raced those edits for no benefit. 4a and 4c went to sub-agents as the table specifies.

4d -- what the merge runs measured

shakenfist/actions#88 merged as f78576e at 2026-09-19T21:39:54Z, taking all three slim-tier nodes from cpu: 4 to cpu: 6 exactly as Prepared changes specified. Because functional-tests.yml:485 calls smoke-cluster.yml@main unpinned, the new shape was live for the next merge-queue run; the first unambiguously on it is run 35472090760 (22:00:54Z). Six Debian 12 tier jobs have since completed, so this section reads six after and four before rather than the three the step brief asked for -- the extra runs cost nothing and Definition of done item 7 wants three of each.

The ledger prediction was exactly right, in every run. Committed vCPU, per node reports 6, 6 and 12 in all six post-reshape runs, for a cluster ledger of 24, against 3, 3 and 6 for 12 in all four before. That is falsification reading 1 ruled out: the infra-role reservation is the absolute 4 threads 4a measured, cpu_schedulable moved 1 -> 2 on the two infra nodes and 2 -> 4 on sf-2, and a larger guest does raise it.

Ledger (primary, sf-1, sf-2) Node-runs at peak frac 1.000 Guard refusals sufficient_idle_cpu drops
Before (4 runs) 3, 3, 6 12 of 12 179, 181, 173, 182 30, 23, 34, 28
After (6 runs) 6, 6, 12 3 of 18 147, 153, 164, 176, 185, 172 5, 4, 9, 4, 4, 14

The allocation bound was relieved and the demand bound was not. Two of those columns moved decisively and one did not, and the difference is the finding:

  • Ledger saturation is gone. Before the reshape every node in every run hit peak frac 1.000 -- the tier ran with its allocation ledger pinned. After, 15 of 18 node-runs sit below it, typically at 0.33 to 0.92.
  • Scheduler drops at sufficient_idle_cpu ("would exceed hard max CPUs") fell from a mean of 28.8 to 6.7, a factor of 4.3. That is the allocation predicate, and it is the one the ledger governs.
  • Capacity guard census refusals did not fall: a mean of 178.8 before against 166.2 after, about 7%, inside the run-to-run spread. They remain demand-dimension and almost entirely alone -- the cpus dimension contributed a single refusal in one run on each side of the change.

That is falsification reading 2: the model is right and F3's bound is what binds. The recorded next action for reading 2 is D3's revision to 8 vCPU or the sibling plan's guard work -- and the split below is the reason to prefer the second.

The refusals did not merely persist, they changed character. The census reports, for each demand refusal, whether measured CPU load was already over the bound by itself or whether the D13 feedforward estimate is what carried it over:

Load alone already over Feedforward carried it over
Before 152, 170, 160, 156 (85-94%) 27, 11, 13, 25
After 53, 89, 48, 114, 116, 101 (29-65%) 93, 64, 116, 62, 69, 71

Doubling the bound did what the arithmetic said it would: measured load is now under it far more often. The refusal count held steady anyway, because expected_demand is a feedforward accumulator -- every admitted placement adds cpus x SCHEDULER_DEMAND_PER_VCPU, so the guard keeps admitting until demand fills whatever bound it is given, and then refuses at the same rate as before. The refusal count is close to invariant under node size; more vCPU changes which placements are refused, not how many. Buying the 8 vCPU shape would buy another inversion of this table rather than fewer refusals, which is an argument for the sibling plan's guard work over D3's revision. This is a finding about the estimator, not about sizing, and it is what phase 5 should inherit.

No structural minimum was broken (F6). test_network_lifecycle, test_affinity, test_binary_affinity_prefers_the_tagged_node and test_database_tier each report a verdict other than SKIPPED in all six runs, read from the stestr output rather than inferred from the job colour. Across the six runs the only skips are test_floating_ips.test_simple (disabled as unreliable), test_placement.test_local_placement_works and test_remote_placement_works (target node does not exist), test_vdi_tokens (KERBSIDE_URL unset), test_coalescing.test_per_node_mesh_work_is_coalesced (dedup events observed) and test_database_tier.test_no_unbudgeted_fixed_rate_database_polling (the tier ran too level a rate to measure). None is a node-count skip, and none of the four named tests skips in any run.

Two of the six jobs failed, both on the same pre-existing flake. Runs 35482487953 and 35485863474 failed only test_nodes.TestNodes.test_cluster_resources_measured_drops_after_delete, asserting that a node publishing cpu_measured 1 did not rise to 4 within 20s (test_nodes.py:294, :356). The same test failed before the reshape in run 35415369050, so it is not attributable to this change: 2 of 6 after against 1 of 4 before. It is a measurement-latency assertion, not a capacity one.

Durations, recorded for 4f. The Run functional tests step took 42, 29, 36, 27, 32 and 30 minutes across the six runs. Six runs is past D5's threshold of five, and a 42-minute worst case leaves 30% headroom under a 60-minute timeout, so 4f's precondition is met; the decision itself is 4f's.

What 4c predicted, and what it got wrong. Nothing. The per-node ledger, cpu_schedulable and demand-bound predictions all held, and the "one thing 4c found that the plan did not anticipate" -- the under-cloud feedforward charge rising from 2.4 to 3.6 per tier node -- did not produce a single ansible failure in the Create a primary instance / Create sf-1 / Create sf-2 tasks across six runs. The prediction this section adds to the record is the one 4c did not make: that relieving the ledger would leave the demand refusal count unmoved.

4e -- slim-primary is not reshaped, and why

D4 asked whether slim-primary should follow slim-tier. It should not, and 4d's evidence is what decides it. This is a decision, not a deferral: Definition of done item 8 is satisfied by recording the evidence, and no diff is prepared for either file.

slim-primary is five nodes, of which the primary carries database_node,primary_node and is not a hypervisor, sf-1 carries hypervisors, network_node, and sf-2 to sf-5 are plain hypervisors (ci-topology-slim-primary.yml:84, :114, :144, :174, :204). By 4a's formula that is one node at ledger 3 and four at 6, a cluster ledger of 27. Three merge runs of Debian 12 cluster from the same window 4d read report:

Run Ledgers Node-runs at peak frac 1.000 Guard refusals Dimension sufficient_idle_cpu drops
35485863474 3, 6, 6, 6, 6 1 of 5 225 demand, 225 alone 12
35490705886 3, 6, 6, 6, 6 1 of 5 210 demand, 210 alone 8
35495432148 3, 6, 6, 6, 6 2 of 5 203 demand, 203 alone 17

Three things in that table rule the reshape out:

  1. There is no allocation problem to fix. p90 frac sits at 0.33 to 0.50 on most nodes and the sufficient_idle_cpu drops are 8 to 17 -- already the level slim-tier only reached after its reshape, and a third of what slim-tier showed before it. The ledger is not what is binding here, so raising it buys nothing.
  2. Its refusals are 100% demand-dimension and higher in absolute count than the reshaped tier's -- 203 to 225 against 147 to 185 on a smaller cluster ledger. That is 4d's invariance restated on a second topology: refusal count tracks the guard's accumulator, not the node size.
  3. The spend is larger for the same predicted non-result. Five nodes at +2 vCPU is 10 more under-cloud vCPU against slim-tier's 6, and F4 records that the two slim-primary files are not structurally identical, so it is two hand-checked diffs rather than one mechanical one.

One thing is worth carrying to phase 5 rather than acting on here: sf-1, the network node, sits at ledger 3 and reached peak frac and p90 frac 1.000 in run 35495432148. That is 4a's infra-reservation pathology on a slim-primary node, and it is real -- but it is one node of five in a cluster with slack elsewhere, and the census says the refusals are demand rather than cpus, so it is not what is refusing. Reshaping the whole topology to relieve one node that is not the constraint is the risk this phase's own risk table names first.

4f -- the tier timeout drops to 60

D5 made this conditional on five merge runs and on the wall clock supporting it. Six runs have landed and Run functional tests took 42, 29, 36, 27, 32 and 30 minutes, a mean of 32.7 and a worst case of 42. Sixty minutes leaves 30% headroom over the worst observed run, which is the same margin the other three matrix entries run with, so timeout_minutes on the Debian 12 tier entry moves from 70 to 60 (.github/workflows/functional-tests.yml).

The comment above it is rewritten rather than deleted. It explained the bump by the tier having half slim-primary's hypervisor capacity, which was true of the ledger before the reshape and is no longer: the tier is still the slower topology because it runs the same suite on three nodes instead of five, but its nodes are no longer allocation-starved. The replacement says that, and records the observed durations so the next reader can see what the 60 is sized against.

What phase 5 inherits

Phase 5 writes the headroom band and the structural-minimum assertion. Four things from this phase change what it can assert.

  1. The band cannot be written against node size. This phase doubled a cluster ledger and the guard refused at the same rate afterwards. expected_demand accumulates cpus x SCHEDULER_DEMAND_PER_VCPU per admitted placement, so the guard admits until demand fills the bound and then refuses; the bound is a rate limit that a bigger cloud raises and then fills. A band expressed as "refusals below N" is therefore a statement about the estimator's calibration, not about whether the cloud is big enough, and phase 5 should say which of the two it is asserting.
  2. The allocation side now has slack, and that is assertable. peak frac on slim-tier fell from 1.000 on every node in every run to 3 node-runs in 18, and sufficient_idle_cpu drops fell from a mean of 28.8 to 6.7. Master plan question 3's proposed upper bound -- peak committed vCPU at or below 70% of ledger at p90 -- is now met with room on this topology, where before the reshape it was violated in every run. The p90 frac readings are 0.17 to 0.58 across the six runs, with one outlier at 1.000.
  3. The infra-reservation pathology survives on slim-primary. Its network node sits at ledger 3 and reached p90 frac 1.000 in one of the three runs read here. 4e declined to reshape the topology for it because the census says demand rather than cpus is what refuses, but a per-node upper bound of the kind the phase 2 baseline proposed would flag that node, and phase 5 should decide whether flagging it is the intent.
  4. The structural minimum held and is now checkable. slim-tier's three nodes still satisfy both >=3 nodes scheduler tests and test_network_lifecycle's two-non-network-hypervisor minimum, verified across six runs by verdict rather than by job colour. There is no slack left there: the assertion phase 5 writes should fail if a topology drops below it, because this phase has confirmed nothing above it is spare.

The sibling coupling is unchanged and still recorded in the master plan's claim layer sitting above that budget section: slim-tier grew from 12 to 18 under-cloud vCPU while claim sizes are still derived from previously observed peaks, which is safe only while CLAIM_ENFORCEMENT_HARD is false.

What the operator owed is discharged. Prepared changes was applied to shakenfist/actions as pull request #88 and merged as f78576e on 2026-09-19, three lines in one file, with the slim-primary topologies and timeout_minutes: 70 left alone as checklist items 4 and 7 required. Nothing in this phase now waits on a repository this session cannot push to.

One thing 4c found that the plan did not anticipate, recorded here because it is a cost of this specific change rather than of reshaping in general: the under-cloud charges each instance a feedforward demand of cpus x SCHEDULER_DEMAND_PER_VCPU (0.6, config.py:532), so a tier node's charge against the under-cloud's scheduler rises from 2.4 to 3.6 and its under-cloud ledger draw from 4 to 6. A refusal there is the

3772 family arriving one level up, and it would surface as an ansible

failure in the Create a primary instance / Create sf-1 / Create sf-2 tasks rather than as a test failure. Only primary carries await: true, so sf-1 and sf-2 would fail at create-API time.

Back brief

Before executing any step, back brief the operator on the understanding of this plan, and in particular on:

This plan is re-entered at 4d, not at 4a, so the brief below is what is still live. D1's gate is closed and 4a, 4b and 4c are done; the first bullet is kept because what the gate cost is a live input to phase 5, not because the gate is still a question.

  • Whether the recorded cost of D1's gate changes your view of gating in phase 5. D1 is closed, and closed on a premise that was wrong: F2 asserted the cited cause was absent from the tree, and it was not. The gate paid for itself in other coin (D1 lists what), but the cheapest check -- docs/operator_guide/scheduler.md:117-128 -- would have answered it outright. If you read that as an argument for fewer gates and more reading, say so, because phase 5 inherits the rule either way.
  • Whether the slim-tier shape should be 6 or 8 vCPU. Still open, and still the decision most likely to be argued with. The measured p90 is 10 committed vCPU against a ledger of 12, and the demand bound (F3) rather than the ledger is what refused everything in the window. D3 chose 6 on three grounds, the first of which is a prior decision rather than a judgement: phase 0's D2 sized this topology for parity with the rest of the fleet, and 3 x 6 gives a cluster ledger of 24 against slim-primary's 27, where 3 x 8 gives 42. Choosing 8 means revisiting D2, and should be argued as that. The case for 8 remains that it quadruples the bound on the small nodes rather than tripling it.
  • That the operator, not this session, applies the tier diff. D6's diff-in-the-plan arrangement is in Prepared changes with an operator checklist. Confirm you are willing to transcribe it to shakenfist/actions, or propose a better seam; 4d cannot begin until three merge runs have read the new shape, and functional-tests.yml:485 references smoke-cluster.yml@main unpinned, so it takes effect on runs already in flight.
  • That no step may change a configuration value to see what happens. This bound 4a and it still binds 4d and 4e. The reservation and the overcommit ratio are deliberately production values in CI (master plan D1), and an experiment that changes them answers a different question than the one asked.