Phase 0: decisions, and an inventory of what scarcity catches

Parent plan: PLAN-ci-cloud-sizing.md.

Planning effort: high. Nothing here is mechanical -- every item is a judgement about what CI is for and what a failure means, and the inventory determines what phase 3 has to build before any cloud is allowed to grow.

Context

The master plan established that the nested CI clouds are sized on the wrong axis: what binds is the scheduler's admission ledger (cpu_schedulable x CPU_OVERCOMMIT_RATIO), not real CPU or memory, which sit at roughly 18% and 50% of allocation with zero swap-out anywhere. slim-primary has a 27 vCPU ledger and passes ~81% of merge runs; slim-tier has about 12 and passes 19%, its failures being the 507 sufficient_idle_cpu family.

Phase 0 does not change any topology. It exists because two of the plan's later phases are only safe if a set of questions are answered first, and because the coverage the undersized clouds give us today is about to be removed by making them bigger. This phase decides the questions and writes down what that coverage actually is.

Scope

In scope:

  • Answering the master plan's six open questions as numbered decisions (D1-D6), plus two the survey added (D7-D8).
  • A scarcity inventory: every distinct failure signature the current clouds produce because they are small, each with a disposition of defect to fix, behaviour to assert, or test bug.
  • Correcting, at source, the master plan claims the survey found to be wrong.
  • Filing or annotating issues so that no signature in the inventory depends on a small cloud to be remembered.

Out of scope:

  • Any change to ci-topology-*.yml, to smoke-cluster.yml, or to the test suites. Phase 1 instruments, phase 3 asserts, phase 4 reshapes.
  • Fixing #3772, #3565 or #3496. This phase gives each a disposition and makes sure a bigger cloud cannot silently close it. Fixing them is scheduler work on its own axis.
  • Anything about the under-cloud's own capacity. #3696 benefits from this plan and is not a deliverable of it (D8).

What the survey found

The master plan was written yesterday, so most of it still holds. Three claims did not survive checking, and they are corrected here and at source.

  1. memory_available is MemAvailable, not MemFree. Open question 5 asked whether page cache inflates the denominator in Scheduler._has_sufficient_ram. It does not: the resources daemon publishes psutil.virtual_memory().available (shakenfist/daemons/resources/main.py:293), which already excludes reclaimable cache. A sufficient_idle_memory refusal therefore means the node genuinely had little memory available, and the question becomes a different one -- see D5.

  2. CI cannot set a per-host reservation without a code change. Open question 1 assumed node_cpu_reservation_threads could simply be overridden from CI's inventory. examples/_shared/site.yml:359 does honour a pre-set value, but CI's inventory is generated by tools/ci-make-inventory.py in shakenfist/actions, whose render_node_vars() emits a fixed block (node_name, node_egress_ip, node_egress_nic, node_mesh_ip, node_mesh_nic) with no hook for arbitrary host vars. Lowering the reservation in CI would therefore mean either extending that generator or passing a cluster-wide --extra-vars, which is not the same thing. This makes the option strictly more expensive than the master plan assumed, and it feeds D1.

  3. The tier's ledger is 12 by derivation and 10 by observation, and nothing explains the gap. _derive_cpu_memory_limits (shakenfist/mariadb.py:23969) computes limit_cpus = floor(cpu_schedulable x CPU_OVERCOMMIT_RATIO), which mirrors _has_sufficient_cpu exactly, so slim-tier's three hypervisors should reconcile to 3 + 3 + 6 = 12. Issue #3907 records the cluster_capacity singleton reporting limit 10. The obvious candidate explanation -- that a node without a capacity row contributes nothing to total_cpus, which the reconciler restricts to capacity_nodes -- cannot produce 10 from 12, because dropping a node subtracts 3 or 6. The discrepancy is real and unexplained; D7 assigns it to phase 2 rather than guessing now.

These three corrections are applied to the master plan in this same commit, so no later step should redo them: open questions 1 and 5 carry their corrected premise, the Situation section quotes the tier's ledger as "12 by derivation, 10 by observation", and every open question now points at the decision below that settled it.

Everything else checked out: the sf-absent phantom is present and commented in ci-topology-slim-primary.yml; functional-tests.yml does hardcode 10.0.0.20-10.0.0.24 for its random upload target; nodelifecycletests.sh does require a script host, a network node and two further victims, all distinct; and AdminResourcesEndpoint (shakenfist/external_api/admin.py:103) is admin-only and returns Scheduler.summarize_resources(), which publishes cpu_hard_max, cpu_measured, cpu_committed and the memory equivalents per node -- so phase 1's probe needs no new server code.

Decision items

D1 -- Widen the nodes; keep the production reservation (open question 1)

Decision: CI nodes gain vCPUs. NODE_CPU_RESERVATION_THREADS and the examples/_shared/site.yml derivation stay at their production defaults in CI.

Reasoning: the reservation arithmetic on small nodes is not incidental to our defects, it is one of them -- #3813 was unsatisfiable precisely at cpu_schedulable < 4, which is the value every CI hypervisor publishes. A CI fleet that no longer produces small cpu_schedulable values would not have caught it. Survey finding 2 also shows the override is not free. Widening costs under-cloud vCPU, which is the resource we have (88 of 234 free at measurement) rather than the one we do not (RAM).

The counter-argument, for the record: a reviewer could reasonably say that CI's job is to test the software, not the deployment sizing, and that buying ledger with a config override is cheaper than buying it with vCPUs. The answer is that the reservation is software here -- it is an input to an admission decision that has already been wrong once -- and that keeping one fleet where cpu_schedulable is small is worth more than the vCPUs it costs.

D2 -- slim-tier is database-tier coverage, sized for parity (open question 2)

Decision: slim-tier exists to exercise a multi-instance sf-database tier. It is sized for a ledger comparable to the other cluster topologies, and it stops being the fleet's scarcity topology.

Reasoning: at 19% it is not delivering the coverage it was built for. test_database_tier skips when it sees fewer than two database nodes, so the assertion it exists to make is only reached on a run that gets that far -- and four runs in five do not. A job that usually fails also stops being read, which is a slower and worse failure than a job that is honestly deleted.

D3 -- The headroom band's form now, its numbers in phase 2 (open question 3)

Decision: the band is expressed over a whole job as:

  • p90(committed vCPU cluster-wide) / ledger -- warn above an upper bound (oversubscribed, 507 risk) and below a lower bound (oversized).
  • any capacity-stage refusal observed during a job that otherwise passes is itself a warning, independent of the ratio. There are four such stages, not three: sufficient_idle_cpu, sufficient_idle_memory, sufficient_free_disk (disk space) and sufficient_idle_disk (disk bandwidth). This clause originally named three, using the bandwidth stage where it meant disk capacity; the phase 1 survey corrected it.

Provisional bounds are 0.70 and 0.35. Phase 2 replaces them with numbers derived from the measured distribution, or keeps them and says why.

Reasoning: committing to the form now is what lets phase 1 build the summary; committing to the numbers now would be inventing them. The second clause matters more than the first: a refusal is a point-in-time fact that a p90 can hide entirely.

D4 -- Node lifecycle keeps five hypervisors; the IP list goes anyway (open question 4)

Decision: the Node lifecycle job keeps its current node count through this plan. Independently of that, the hardcoded 10.0.0.20-10.0.0.24 upload-target list in functional-tests.yml is replaced with a pick derived from the API, in phase 4.

Reasoning: the lifecycle test needs a script host, a network node and two distinct victims, and it kills two of them; it is the one job where node count is load-bearing for the test rather than for capacity. It is also the healthiest job in the fleet at 92%, so there is nothing to buy. The IP list is a separate matter: it is a coupling between a workflow file and a topology file that will break silently the moment any topology changes, which is exactly what phase 4 does.

D5 -- Memory is a real second constraint (open question 5, corrected)

Decision: treat memory as a genuine binding dimension, not an artefact. No topology's per-node RAM is reduced below the measured p90 plus a margin phase 2 sets, and phase 1's probe records memory headroom alongside CPU. Phase 2 must also measure capacity refusals per stage -- cpu, memory, disk space and disk bandwidth counted separately, not as one combined number -- since a reshape that relaxes one stage can tighten another. The phase 1 survey corrected this item too: it originally said "cpu, memory and disk", which collapses the two distinct disk stages, only one of which is a capacity check at all.

Reasoning: survey finding 1 removes the reason to disbelieve the one observed sufficient_idle_memory refusal. The measured peak usage (4.9-7.6 GB of 12 GB on slim-primary, 7.5-10.2 GB on the tier) says there is some room, but it also says a three-hypervisor topology uses most of a 12 GB node -- so the RAM saving comes from having fewer nodes, not from making each node smaller.

D6 -- The sf-absent phantom stays, and every phase says so (open question 6)

Decision: slim-primary keeps its unreachable sf-absent hypervisor. Every phase plan that touches a topology file restates this in its own scope section rather than relying on the comment in the topology file.

Reasoning: it is the regression guard for the 2026-07-20 deploy where one dead hypervisor aborted the deploy on every healthy node. A node that exists only to be absent is exactly the kind of thing a reshaping pass deletes as an oversight, and the comment in the file has already had to say "DO NOT FIX THIS" in capitals once.

D7 -- The 12-versus-10 ledger discrepancy is phase 2's to resolve (survey)

CLOSED by the phase 2 survey: the tier's ledger is 12, and the discrepancy no longer exists. Phase 1's headroom series reports a slim-tier cluster ledger of exactly 12.0 with per-node limits of 3, 6 and 3, over 399 node-samples carrying a real capacity row and zero fallbacks to cpu_hard_max; and #3907, closed COMPLETED on 2026-08-27, quotes the cluster_capacity singleton itself refusing a claim with cpus (limit 12, used 9, requested 4). Both halves agree. Phase 2 confirms the fallback count across its whole window rather than re-litigating the figure, because a node without a capacity row would change what the ledger column means. The original decision is kept below with its reasoning intact.

Decision: phase 2 reconciles the live derivation in Scheduler._has_sufficient_cpu against the reconciled cluster_capacity.total_cpus for the same cluster, and reports which is right. Until it does, this plan quotes both and asserts neither.

Reasoning: a sizing decision made against the wrong ledger is wrong by construction, and the two figures disagree by an amount no candidate explanation produces. #3882 (the reconciler does not log the drift it corrects) is why this cannot be settled from logs after the fact, and is a reason to do it while a cluster is live.

D8 -- #3696 is a beneficiary, not a deliverable (survey)

Decision: the under-cloud saturation issue -- self-hosted runners losing communication mid-test when concurrent merge groups saturate the under-cloud -- is named in this plan as something the RAM reduction should help, and is not scoped as work here.

Reasoning: a merge run allocating ~95% of the under-cloud's physical memory is a plausible contributor, and a plan that quietly claimed to fix it would take credit for a correlation. Phase 2's measurement is the place to say whether the reduction moved it.

The scarcity inventory

The deliverable phase 3 is built from. Each signature is what a small cloud produces today, and what happens to that coverage when the cloud grows.

Signature Issues Disposition
Instance create refused 507 sufficient_idle_cpu under suite concurrency #3772 (umbrella, closed 2026-09-09); #3498, #3602, #3670, #3728, #3749, #3767 (closed members) Behaviour to assert. Phase 3 asserts what the server does today. Correction (2026-09-10): this row said "#3772 stays open: its own verdict is that a bare 507 is the wrong answer to a transient condition". The verdict is unchanged, but the issue is not open -- it was closed by hand on 2026-09-09 with no closing comment and no commit claiming it, hours after two fresh recurrences. The record of what a capacity refusal should do has moved into PLAN-transient-capacity-refusals.md, which owns that change and which this plan deliberately does not. Phase 3 also no longer fills a whole cluster: see its D23 and D24, which fill one node and prove the refusal contract with a request no cluster could satisfy.
Instance create refused 507 sufficient_idle_disk, a rate predicate rather than a ledger #3772 (umbrella, open) Behaviour to assert; sizing does not address it. _has_idle_disk_bandwidth() (shakenfist/scheduler.py:495) checks disk-busy rate against a metric unrelated to cpu_schedulable or memory. A 2026-08-21 comment on #3772 records an occurrence at exactly this stage on the single-node smoke topology, under a pull_request event, with the node hosting only two instances and every other capacity stage passing -- a cluster nowhere near full. Widening vCPUs does nothing for it. Phase 3's saturation test must cover this stage directly rather than assume the CPU-stage test also exercises it. Correction (2026-09-10): it cannot. The predicate reads a measured disk-busy rate republished on the resources daemon's 60 second cadence, against a 1200 ms/s threshold that /admin/resources does not publish at all, so no functional test can force it and none can observe why it did or did not fire. Phase 3's D25 covers it with a unit test of the predicate instead, and records that the stage phase 0 singled out as the one sizing cannot fix is also the stage that phase least covers.
Claim growth refused because the concurrent suite holds the cluster #3907 (closed) Test bug, already fixed, by routing success-asserted claim requests through a transient-tolerant retry. Phase 3 keeps a test that exercises the refusal path directly, so the retry cannot mask a genuine regression in claim admission.
Soft affinity loses to resource filters; instances that should share a node do not #3565 (closed 2026-08-31) Test bug, not here -- originally classified defect to fix; see the 2026-09-01 correction at the end of this cell. This is the most frequent slim-primary failure in the sampled window. A 2026-08-26 comment on the issue traces the most recent occurrence to sufficient_idle_memory, not sufficient_idle_cpu -- the candidate shapes consolidate onto fewer, larger hypervisors, which raises instances per node, so growing the cloud may relax the CPU filter while tightening the memory one instead of making the test uniformly greener. Fixing the scheduler is still not this plan's job. Phase 3 gives it a deterministic reproduction (fill the affinity target, then place) so it stops depending on ambient load. Correction (2026-09-01): the original disposition, "defect to fix", did not survive contact with a full trace, and the lede above has been changed to the classification that replaced it. scheduler-reservations phase 6 closed #3565 on a test change: the candidate set had collapsed to a single node before affinity was scored, so there was no tiebreak to lose and no scheduler defect behind it. The deterministic reproduction phase 3 owes it is still worth having -- it is now coverage of a documented guarantee rather than a hunt for a bug -- but this row's classification should be read as test bug.
Targeted create silently lands on a different node #3496 (closed 2026-08-29) Defect to fix, not here. Related but distinct: force_placement tests cannot fall back to a less loaded node, so they fail first under scarcity. Record the interaction; phase 3 asserts the documented behaviour of a targeted create against a full node. Deliberately not given a heads-up comment, unlike #3565 and #3772: this issue's recorded occurrence is a wrong-node placement with no refusal and no stage trace at all, and the one capacity mode it names it hands off to #3772, so a note predicting that it will reproduce less often would assert a connection its own evidence does not carry.
Demand guard refuses every placement below four schedulable threads #3813 (closed) Fixed, and the reason for D1. No further coverage needed beyond keeping a fleet where cpu_schedulable is small, which D1 does.
Runners lose communication when concurrent merge groups saturate the under-cloud #3696 (closed 2026-09-05), #3718 (open) Out of scope per D8; the family has two observed shapes -- a runner dying mid-test, and a nested node never booting far enough to answer SSH. Named so that a later reduction in footprint can be checked against it. In the same window as the two dead runners, three other attempts by the same PR failed with 507 sufficient_idle_cpu (citing #3498 and #3670), which suggests the under-cloud shortage and the inner-cloud 507s are the same shortage observed at two levels -- a reading the issue itself calls "well supported by the surrounding evidence" rather than proven.

The sweep also turned up hits that are not scarcity signatures, and are deliberately not rows above. #3516 (sf-sidechannel orphans agent operations in executing) is a stuck-state defect with no capacity trigger. #3770 (the Guests suite stalling because _await_agent_state's deadline is renewed by any event, not only the one it is actually waiting for) is a logic bug in the wait itself, not a resource refusal. #3720 (ImageMissingFromCache on a redirected start) is a cache-consistency defect independent of cluster size.

3652 and #3669 are deterministic CI test bugs that fail regardless of

how much capacity is available. All five matched the search only because the searched words appear somewhere in their text, not because they describe scarcity.

One further trap is worth recording here. #3602 (closed) and #3603 (open) are the same test, test_disappearing_source_instance, with two entirely different causes: #3602 is the 507 scarcity failure already counted as a member of the #3772 umbrella above, while #3603 is a genuine defect where an instance built from a cached image whose source URL has since gone missing enters an error state. #3603 is not a scarcity signature and does not belong in this table. Matching by test name rather than by cause would conflate the two.

Two properties of this table are the point of it:

  • Nothing in it is closed by growing a cloud. Two entries are defects that a bigger cloud makes less visible, which is the failure mode the user asked to avoid.
  • Every entry that is "behaviour to assert" names a test phase 3 owes, and phase 4 is gated on those tests existing.

Step plan

Step Effort Model Isolation Brief for sub-agent
0a medium sonnet none Sweep the issue tracker for capacity-shaped CI failures beyond the six already in the inventory table above: search closed and open issues for sufficient_idle_cpu, 507, InsufficientResources, and for the phrase "suite concurrency". For each hit not already in the table, decide whether it is the same signature as an existing row (add the number to that row) or a new one (add a row, with a disposition drawn from the three permitted values). Do not open or modify any issue in this step -- report candidates instead. Edit only docs/plans/PLAN-ci-cloud-sizing-phase-00-decisions.md.
0b high opus none Post a comment on #3565 and on the #3772 umbrella recording that a CI topology change is coming which will reduce how often the issue reproduces, linking this phase plan, and stating the deterministic reproduction phase 3 owes it. Do not change state or labels. #3496 is deliberately excluded -- see its inventory row for why -- so a draft written for it should be discarded rather than posted. Judgement is needed on the wording: these must read as "this will get quieter, and that is not a fix", not as a status update. The management session reviews the exact text before anything is posted -- this writes to a public tracker.
0c low haiku none Set the phase 0 row to Complete in the master plan's Execution table and update the docs/plans/index.md arithmetic to 1 of 7, then run python3 tools/check-plan-status.py. Do this only after 0a and 0b are reviewed.

The survey corrections that would otherwise have been a step here were made in the planning commit, per the note under What the survey found.

Risks and mitigations

  • The inventory is incomplete, and phase 4 removes coverage nobody wrote down. Step 0a sweeps the tracker, but the tracker only holds what someone bothered to file. Mitigation: phase 1 lands before phase 4 and counts refusals per run, so a signature that only ever showed up as an unfiled flake still shows up as a number. The management session checks that phase 2's refusal counts have no signature the inventory lacks.
  • D1 is the decision most likely to be argued with. Buying ledger with vCPUs when a config override would do is a real cost. Mitigation: the reasoning is written above rather than implied, and the survey finding that the override needs a generator change is recorded so the trade can be re-opened with the true price on it.
  • Deciding the band's numbers in phase 2 could slip into never. Mitigation: D3 fixes provisional bounds now, so phase 5 has something to enforce even if phase 2's analysis is thinner than hoped.
  • Commenting on issues is outward-facing. Step 0b writes to a public tracker. Mitigation: the management session reviews the exact comment text before it is posted, and the step is explicitly barred from changing state or labels.

Definition of done

Falsifiable, in order:

  1. docs/plans/PLAN-ci-cloud-sizing.md contains no statement that contradicts the three survey findings above. Specifically: no sentence asks whether page cache inflates memory_available; open question 1 names ci-make-inventory.py; and the tier's ledger is never given as a single unqualified number. (Done in the planning commit; re-check rather than redo.)
  2. Every open question 1-6 in the master plan carries a pointer to the decision D1-D6 that settled it. (Done in the planning commit.)
  3. The inventory table has a row for every issue returned by a tracker search for sufficient_idle_cpu, and each row's disposition is one of the three permitted values.
  4. 3565 and #3772 each carry a comment linking this phase plan and

    stating that a topology change will change their reproduction rate without fixing them, and neither had its state or labels changed. #3496 carries no such comment, and the reason is recorded in its inventory row rather than left as an omission.
  5. No file outside docs/plans/ is modified by this phase.
  6. python3 tools/check-plan-status.py passes, and pre-commit run --all-files passes.

What phase 1 inherits

  • D3's band form, which is what phase 1's summary must compute: p90(committed vCPU) / ledger per job, plus a refusal count.
  • The confirmation that /admin/resources already publishes every input phase 1 needs, so phase 1 is a workflow change in shakenfist/actions and needs no server-side work.
  • D7, which makes "compare the live derivation against cluster_capacity" an explicit thing phase 1's series must make possible -- the probe should record both, not just the live figure.

Back brief

Before executing any step of this plan, back brief the operator on the understanding of it, and in particular on the wording intended for step 0b before any comment is posted to a public issue.