Phase 4: Workflow integration (merge_group package-matrix job)

Master plan: PLAN-distro-matrix-ci.md. Planning effort: medium. Isolation: none. Depends on phases 1, 2, 2b, 3 — all complete as of 2026-08-11.

Rewritten 2026-08-11 from the original sketch. The sketch was written before phases 2b and 3 executed and before anyone had read the sibling repo's merge-queue implementation; it contained one instruction that would have broken PR CI (see "Corrections" below).

Objective

Add a package-matrix job to .github/workflows/functional-tests.yml, gated to merge_group events, that fans out over the seven matrix distros and runs tools/test-package-functional.sh for each against a single shared pair of build artifacts. Add the aggregate can_merge gate the queue will require. PR events keep today's jobs; the matrix runs only in the merge queue and on workflow_dispatch.

Grounding facts (verified 2026-08-11)

Read before changing anything; these were checked against the tree and the sibling repo, not recalled.

  • functional-tests.yml has no merge_group trigger today. It fires on pull_request (with a paths: filter over src/**, crates/**, tests/**, scripts/**, tools/**, Makefile, and the workflow itself) and workflow_dispatch. 807 lines, 9 jobs.
  • Job graph. test-partition (gated pull_request, s runner) · build-and-test (s, ungated) · package-smoke, integration-core, integration-convert-qcow2, integration-convert-vhd, snapshot-harnesses, oslo-crossval-master (all needs: build-and-test, all [self-hosted, debian-12, xl]) · automated_reviewer.
  • Only test-partition carries an event gate. Every other job runs on whatever the workflow triggers on. Adding merge_group: to the trigger list therefore re-runs the entire PR suite inside the queue unless each job is gated. This is the single largest decision in the phase (D2).
  • package-smoke (line 260) is the artifact-producing precedent: make instar && make deb, then tools/test-package-install.sh on debian:trixie. It builds the .deb in-job and does not upload it.
  • Testdata prep is a solved step. tools/ci/prepare-testdata.sh clones with secrets.GITLAB_TESTDATA_TOKEN, materialises LFS, canary-verifies, and writes TESTDATA_PATH=<path> to $GITHUB_ENV. integration-core (line 311) is the pattern to copy verbatim, including the resparsify step that follows it.
  • The runner's interface (tools/test-package-functional.sh): [--smoke] [--select REGEX] [--concurrency N] <package> <distro-image>, reads TESTDATA_PATH from the environment, needs docker and /dev/kvm, prints a --- Versions under test --- block containing qemu-img --version, and ends with PASS:/FAIL: <pkg> functional suite on <distro>. It already fails loudly on a truncated run (the subunit-4MB worker death, a worker reporting N/A elapsed, and a full run executing fewer than 2500 tests).
  • Package output paths. make debsrc/target/debian/instar_*.deb; make rpmsrc/target/generate-rpm/instar-*.rpm; make package does both. Both are compile-free repackaging of what make instar produced.
  • Sibling pattern of recordshakenfist/shakenfist's functional-tests.yml:
  • trigger is a bare merge_group: alongside pull_request: with a branches: (not paths:) filter;
  • matrix jobs gate on (github.event_name == 'merge_group' || github.event_name == 'workflow_dispatch'), which is what makes a dispatch dry run possible;
  • the required check is an aggregate job, can_merge, with if: always() && github.event_name == 'merge_group', needs: the matrix jobs, and a jq expression over toJSON(needs) asserting every dependency is success or skipped. can_enqueue is its PR-side twin;
  • docs-only changes are handled by a check_paths job using dorny/paths-filter@v4 with predicate-quantifier: 'every', whose code_changed output gates the heavy jobs — not by a trigger paths: filter.

Corrections to the original sketch

  • Step 4e was wrong and would have broken PR CI. It said to add the matrix to "the aggregate gate (the needs: list that the branch-protection required check depends on — see the package-smoke entry at functional-tests.yml:783)". Line 783 is inside automated_reviewer, which is the PR auto-review job, not a gate. Its needs: list exists to hold the reviewer back until CI passes. Adding a merge_group-only job to it would make the reviewer skip on every PR, because a job whose dependency is skipped is itself skipped by default. This repo has no aggregate gate at all today; phase 4 must create one (can_merge, per the sibling), and automated_reviewer must not be touched beyond an explicit pull_request gate.
  • merge_group does not honour the trigger's paths: filter. The filter on pull_request is not inherited, so the workflow always runs in the queue. That is the safe direction — a required check that never runs would hang the queue forever — but it means a docs-only PR pays for the full matrix unless a check_paths-style job is added (D4).
  • The matrix table's qemu estimates are stale. Phase 3 measured Rocky 9 shipping qemu 10.1.0, not the 8.2 the master plan estimated. Phase 2c/2b measured all seven. Take versions from those measurements, and let the job report the live version (4c) rather than asserting a table.

Decisions

D1. Trigger and gating shape

Add a bare merge_group: to the trigger list. Gate the new matrix and its build job on (github.event_name == 'merge_group' || github.event_name == 'workflow_dispatch'), matching the sibling exactly. The dispatch arm is what makes the phase acceptance runnable without enqueuing anything.

D2. What the queue runs — recommendation: matrix + a fast build gate only

Because only test-partition is gated today, the naive change makes the queue run seven xl integration jobs plus seven matrix containers. Recommendation:

  • Keep build-and-test ungated so it also runs in the queue — it is the cheap s-runner fast-fail, and the package build depends on a working build anyway.
  • Gate package-smoke, integration-core, integration-convert-qcow2, integration-convert-vhd, snapshot-harnesses, oslo-crossval-master, and automated_reviewer to github.event_name != 'merge_group'.

The justification is coverage, not cost alone: each matrix entry runs the full suite (D3 of the master plan) against the packaged binary, so the queue's coverage is a superset of the PR integration jobs on seven distros rather than one. Re-running the PR jobs in the queue buys a second copy of a strictly weaker signal. Record this reasoning in the workflow as a comment — the next reader will otherwise "fix" the gates.

D3. Build once, consume seven times

Add a package-build job (needs: build-and-test, merge_group-gated) that runs make instar && make package and uploads src/target/debian/instar_*.deb and src/target/generate-rpm/instar-*.rpm as one artifact. Each matrix entry downloads it and picks the file its pkg_kind names.

This is only valid because phase 1 lowered the build floor to bullseye (GLIBC_2.30), making one artifact set installable on all seven distros — it is the concrete payoff of decision D1 in the master plan, and phase 1's completion is what unlocks it. Assert it rather than assume it: if a matrix entry ever fails at install time, that is a floor regression, not a test failure.

D4. Docs-only changes in the queue

Recommendation: defer. Adopting the sibling's check_paths job is the right long-term shape, but it is a change to how every job in this workflow is gated and it is not needed for the matrix to work. Ship the matrix first; revisit if docs-only merges prove painful. Note it explicitly in the phase-5 handover so the operator knows a docs-only PR currently pays full matrix latency.

D5. Fan-out control — full seven-wide, no max-parallel

fail-fast: false always: one distro's failure must not mask the other six.

Do not set max-parallel. An earlier draft of this plan proposed capping it, reasoning from seven containers at --concurrency 4 as "28 concurrent KVM workloads". That framing was wrong. The xl runners are started on demand (confirmed with Michael 2026-08-11; the repo distinguishes on-demand s/xl from the always-up [self-hosted, static] pool, which it already uses in five places). Each matrix entry therefore lands on its own VM: 4 concurrent KVM workloads per runner, seven runners, no cross-entry contention. The phase-2c load artifacts that motivated the cap came from running all seven on the dev host simultaneously, which is not what CI does.

Capping the fan-out would serialise on-demand VMs that never compete for anything, multiplying merge-queue wall clock for no benefit. Since the matrix gates merges rather than pushes, one-entry-plus-runner-start latency is the right trade.

Steps

Step Effort Model Isolation Brief for sub-agent
4a medium sonnet none Triggers and gates (D1, D2). Add bare merge_group: to on:. Add if: github.event_name != 'merge_group' to package-smoke, integration-core, integration-convert-qcow2, integration-convert-vhd, snapshot-harnesses, oslo-crossval-master, automated_reviewer; leave build-and-test ungated and test-partition as it is. Comment the why (D2's coverage argument) at the top of the job list. Verify with actionlint and by reading each job's resulting effective condition — do not add the matrix yet.
4b medium sonnet none package-build job (D3). needs: build-and-test, gated merge_group \|\| workflow_dispatch, [self-hosted, debian-12, xl]. Copy package-smoke's docker install + docker image rm -f instar-build instar-release preamble. Run make instar && make package. actions/upload-artifact@v4 with a single named artifact containing both src/target/debian/instar_*.deb and src/target/generate-rpm/instar-*.rpm; if-no-files-found: error so a missing .rpm fails here rather than in seven confusing places.
4c high opus none package-matrix job. needs: package-build, same gate, [self-hosted, debian-12, xl], strategy: {fail-fast: false} with no max-parallel (D5 — on-demand runners, one VM per entry), matrix.distro as a list of objects {name, image, pkg_kind} over the seven entries in the master-plan table (debian:12, debian:13, ubuntu:22.04, ubuntu:24.04, fedora:latest, rockylinux:9, rockylinux/rockylinux:10). name: "${{ matrix.distro.name }}". Steps: checkout into instar/ (mirror integration-core's two-checkout layout), prepare-testdata.sh with TESTDATA_TOKEN, the resparsify loop, docker install, download-artifact, then tools/test-package-functional.sh <resolved package> <image>. Resolve the package path by pkg_kind in a script, not inline YAML (per the no-large-scripts-in-workflow-steps rule) — extend tools/ci/ with a small resolver or add a --pkg-kind mode to the runner; decide and document which. timeout-minutes per R3.
4d medium sonnet none Result surfacing. Tee the runner output; on completion append a row to $GITHUB_STEP_SUMMARY with distro name, image, the live qemu-img version parsed from the runner's --- Versions under test --- block, the Ran:/Passed/Skipped/Failed totals, and PASS/FAIL. Use if: always() so failures report too. Put the parsing in a tools/ci/ script, not inline YAML. The qemu version in the summary is what makes a red row attributable to a version boundary rather than a packaging bug (phase 2/2b lineage).
4e medium sonnet none Flake quarantine (master-plan policy). Support an optional allow_failure: true key on a matrix entry, consumed as continue-on-error: ${{ matrix.distro.allow_failure \|\| false }}. Default no entry to it. Document in the workflow comment and docs/testing.md: an entry that fails twice consecutively for a reason established as environmental gets the flag with a linked issue, and the flag is removed when the issue closes. Note the sharp edge — a continue-on-error job reports success to the needs context, so a quarantined entry genuinely stops gating.
4f medium sonnet none can_merge aggregate gate (corrects sketch 4e). New job: needs: [package-build, package-matrix], if: always() && github.event_name == 'merge_group', runs-on: [self-hosted, static] (it is a five-second jq check — do not boot an on-demand VM for it; the sibling's can_merge/can_enqueue use static for the same reason, and this repo already uses that label in five places), permissions: {actions: read}, and the sibling's jq body — ALL_SUCCESS=$(echo "$NEEDS_JSON" \| jq '. \| to_entries \| map([.value.result == "success", .value.result == "skipped"] \| any) \| all') then [ $ALL_SUCCESS == true ]. Do not touch automated_reviewer's needs:. This job's name is what phase 5 makes the queue's required check.
4g low sonnet none Docs. docs/testing.md: the PR-vs-merge-queue job split, the seven entries, the quarantine policy, and how to reproduce one entry locally (tools/test-package-functional.sh with --select). AGENTS.md/ARCHITECTURE.md: a pointer only, no duplication. CHANGELOG [Unreleased]. Update the master plan's phase-4 row and its stale qemu-version estimates against the phase-2c/2b measurements.

Execution results (2026-08-11)

Implemented 4a-4g. Three new scripts keep the workflow declarative, per the no-large-scripts-in-CI-steps rule: tools/ci/resolve-package.sh (glob one package of a kind, failing loudly on zero or two matches), tools/ci/summarise-matrix-entry.sh (parse the runner's log into a job-summary row), and tools/ci/run-matrix-entry.sh (the per-entry wrapper CI calls).

Verified locally:

  • Job graph simulated per event. pull_request runs exactly today's nine jobs — no matrix, no can_merge, no added latency. merge_group runs only build-and-test, package-build, package-matrix, can_merge. workflow_dispatch runs everything except test-partition and can_merge, which is the dry-run path.
  • Both package families end-to-end through the real wrapper: Debian 13 / .deb / apt reported qemu-img 10.0.11, and Rocky 9 / .rpm / dnf reported qemu-img 10.1.0, each producing a correct summary row. (Run with MATRIX_SELECT to bound cost; the full-suite behaviour is phase 3's, unchanged.)
  • The summariser degrades correctly: a run that dies before the versions block reports qemu-img unknown and ? totals rather than failing, and a missing log warns instead of crashing.
  • resolve-package.sh rejects both the no-match and multi-match cases.
  • actionlint and shellcheck clean.

One design change from the plan. allow_failure is declared explicitly as false on all seven entries rather than being an optional key: actionlint types the matrix object from its literal entries, so an absent property is an error even behind || false. Declaring it per entry is better anyway — quarantine state is visible per row, and flipping one is a one-word diff.

First live fan-out (run 31533536833, 2026-08-11)

workflow_dispatch on matrix-ci. All seven entries PASS, 0 failures, spanning six qemu-img versions from 6.2.0 to 10.2.2:

Distro qemu-img Ran Passed Skipped Failed Duration
Ubuntu 22.04 6.2.0 3262 2477 785 0 34 min
Debian 12 7.2.22 3262 2477 785 0 23 min
Ubuntu 24.04 8.2.2 3262 2477 785 0 39 min
Debian 13 10.0.11 3262 2477 785 0 35 min
Rocky 9 10.1.0 3262 2415 847 0 25 min
Rocky 10 10.1.0 3262 2415 847 0 48 min
Fedora latest 10.2.2 3262 2477 785 0 28 min

Every entry ran the same 3262 tests. The two RHEL rows skip exactly 62 more than the rest, which is skip_unless_qemu_supports() handling RHEL's qemu omitting the qed/qcow/parallels/dmg/bochs/cloop drivers (phase 2) — a consistent, explained difference, not drift.

This also confirms phase 2b against live old qemu rather than the static per-version binaries it was measured with: Ubuntu 22.04 (6.2.0) and Debian 12 (7.2.22) were 21 failures each before 2b, and Ubuntu 24.04 was 2.

Timings (R1/R3 answered). Per-entry suite runtime is 23-48 min, median ~34 — well inside the 120-minute timeout, which can stay as headroom. The whole matrix took 89 minutes wall-clock (01:14 → 02:43) in two waves, so the effective xl concurrency was about four then three, not seven. Provisioning, not the cap we declined to set, is what serialises the fan-out; max-parallel would only have made this worse, so D5 stands even though its "one entry plus boot" latency estimate was optimistic.

Note this dispatch is the worst case for scheduling: it runs the PR jobs and the matrix, and it competed with a concurrent PR run (31533917315) for the same pool. package-build sat queued 2h20m as a result. A real merge_group event runs only build-and-test, package-build and the matrix, so it should schedule better than this.

Still outstanding:

  • GITLAB_TESTDATA_TOKEN on a merge_group event specifically. The token demonstrably works on workflow_dispatch, which is strong evidence (secrets are exposed the same way to non-fork events) but not the same event class. First queue run confirms it.
  • can_merge has never reported — it is merge_group-only, so its check context does not yet exist in this repository. That matters for phase 5: requiring a context GitHub has never seen is the one way to jam every merge.

Acceptance

  • A workflow_dispatch dry run fans out over all seven distros, each installing the shared artifact and running the full suite.
  • Build-once/consume-many confirmed: one .deb and one .rpm feed all seven entries, and no entry rebuilds instar (D3, the phase-1 payoff).
  • The job summary names each distro, its live qemu-img version, its test totals, and its result.
  • pull_request runs are unchanged: same jobs, no matrix, no added latency. Verify by reading a real PR run, not by reasoning.
  • can_merge exists, aggregates the matrix, and reports only on merge_group. automated_reviewer still runs on PRs.
  • Measured wall-clock recorded in this file, split into runner boot + image pull versus suite runtime, so phase 5 can size the queue (R1, R3).
  • actionlint and shellcheck clean via pre-commit run --all-files.

Risks

  • R1 — RESOLVED 2026-08-11: runner pool elasticity. The xl runners are started on demand, so seven concurrent entries do not starve a fixed pool and max-parallel is unnecessary (D5). What remains is cost, not contention: each entry boots a VM and pulls a distro image before any test runs, and the queue pays that seven times per merge. Measure the boot+pull overhead separately from suite wall-clock in 4c's dispatch run, so phase 5 can size the queue honestly.
  • R2 — KVM contention within an entry. Cross-entry contention is not a risk (D5: one VM per entry). Within an entry, the container still runs at --concurrency 4, which is the setting phase 3 made tunable for exactly this reason. Phase 2c's nine load-artifact failures came from co-located runs on the dev host, so they do not predict CI behaviour — but the failure mode is still live at any concurrency, and any first-run divergence must be classified by isolated --select replay before being called a regression (memory: diffuzz_spurious_divergence_contention).
  • R3 — timeouts are unmeasured. The suite is ~3250 tests; the dev host does ~15 min across 16 workers, and phase 3 flagged that --concurrency 4 in one container is materially longer without recording the number. Set generous timeout-minutes (90 as a starting point), measure on the first dispatch run, then tighten. A timeout that fires mid-suite in the queue looks like a flaky distro.
  • R4 — GITLAB_TESTDATA_TOKEN in merge_group. Downgraded 2026-08-11: Michael is confident the token is available to merge CI, so this is no longer a design risk and needs no contingency. It stays listed only because the failure mode is deceptive — a queue run that cannot fetch testdata mounts LFS pointer files and produces a mass "file format: unknown" result that reads as an instar regression rather than a credentials problem (memory: testdata_lfs_pointer_drift). prepare-testdata.sh canary-checks for exactly this, so it will fail loudly and early; no separate verification step is needed.
  • R5 — a skipped dependency skips its dependents. The mechanism behind the sketch's broken 4e. Any needs: edge crossing the PR/merge_group boundary must use if: always() && <event test>, as can_merge does. Re-check every needs: after 4a's gating changes.
  • R6 — continue-on-error reports success. A quarantined entry (4e) does not merely tolerate failure; it becomes invisible to can_merge. That is the intent, but it means a forgotten flag silently drops a distro from the gate. Tie each flag to an open issue.

Out of scope

  • Enabling the merge queue itself and the verification merge — phase 5.
  • Adopting check_paths/dorny/paths-filter for docs-only skipping (D4) — deferred, noted for phase 5.
  • Any change to instar behaviour or to the runner script's semantics. If a matrix entry finds a real parity gap, it is a new phase, not a fix folded in here (this is how phase 2b came to exist).
  • Publishing the built packages anywhere — they are CI artifacts only.