PLAN-543: Cut the merge queue's critical path

Status: Complete

Every step in the Execution table is done. Steps 1 to 6 and 8 landed in #671 (merged as eea59b99), with step 5's measurement recorded under Execution ("The step-5 measurement"). Step 7's two halves landed in #673 (merged as 673233f3), the second once the conductor gate cleared; the step 7 row records both and the evidence for the gate. The post-merge work is recorded under Execution ("The step-7 measurement" and "The second push audit").

A red nightly that was not the disk. On 18 Oct the six VHD tests this plan moved off the merge queue failed on all seven distros (#780 to #786), each in a fraction of a second with instar info returning Invalid argument (os error 22). That was the first nightly to read the testdata disk, and the merge queue cannot see those six tests, so the disk was the obvious suspect -- and wrong. The cause was #778: Debian's 6.12.113 kernel, which reached the CI runner images in the same window, rejects KVM_SET_SREGS when the VMM sets no guest CPUID. The evidence is a pair of nightlies that both read the disk: run 39080337878 on 81423f22 failed every leg, and run 39178562519 on b0e1f249 passed every leg (six tests in 662 s on Debian 13), with only #779 and #788 -- the #778 fix -- between them. It is recorded here because the coincidence will recur: a nightly-only test set means a regression that lands alongside an infrastructure change is first seen together with it.

543 itself is not closed by this plan: the capacity direction is its

other half.

Prompt

Before responding to questions or discussion points in this document, explore the instar codebase thoroughly. Read relevant source files, understand existing patterns (the workflow's gating model, the Makefile test-container-* selectors, the test-partition guard, tools/ci/ script and self-test conventions), and ground your answers in what the code actually does today. Do not speculate about the codebase when you could read it instead. Flag any uncertainty explicitly rather than guessing.

Consult AGENTS.md for build commands and conventions, docs/testing.md for the distro matrix's documented behaviour, and .github/workflows/functional-tests.yml:26-53 for the recorded argument about what runs where. That comment block is a decision, not a description; this plan changes one of its premises and must say so there rather than quietly working around it.

The request was to triage #652's merge-queue timeout, which became the measurement issue #543 had been waiting for. The first draft of this plan proposed packing the seven matrix legs into three jobs. Michael then asked whether any jobs should move to a scheduled nightly instead, and whether a big data copy at the start of each leg could be cached. Measuring both questions moved the plan off packing and onto the suite; see Situation.

Plan file conventions (shared block; do not edit -- the canonical copy lives in shakenfist/development at templates/shared-blocks/plan-file-conventions.md):

  • All planning documents live in docs/plans/.
  • Detailed planning gets one plan file per phase. Phase files are named for their master plan, sit in the same directory as it, and append -phase-NN-descriptive before the .md extension.
  • The master plan tracks its phases in a table under its Execution section:
Phase Plan Status
1. Schema migration PLAN-thing-phase-01-schema.md Not started
2. Public API PLAN-thing-phase-02-api.md Not started
  • One commit per logical change, and at minimum one commit per phase. Unrelated changes are not batched into a single commit. Each commit is self-contained: it builds, passes tests, and has a message explaining what changed and why.

This is a single-change plan in the shape of PLAN-611-backing-path-oracle.md: one pull request, no phase files. Its steps are the Execution table below, and the push audit is its last step.

Situation

Issue #543 records a run of checks_timed_out ejections of green pull requests from instar's merge queue -- five of them tabulated in its 2026-10-10 update. The cause was found that day and fixed in private-ci#66: the provisioner walked CI_IMAGES then CI_SIZES in declaration order, so any queued xs/s/m/l job took the fleet's free slot ahead of every xl job, however long the xl job had waited. Oldest-queued-first replaced that.

PR #652's ejection on 2026-10-12 was the first after the fix, and so the measurement #543 said instar's CI changes were on hold for. The fix did what it was designed to do, and it is not enough. Queue wait per xl matrix job, before (15 merge groups, 09-30 to 10-09) and after (6 merge groups, 10-10 to 10-12):

Before After
Jobs measured 105 40
Median wait 90 min 121 min
p90 wait 352 min 188 min
Max wait 524 min 236 min
Never scheduled 0 2

Fair ordering removed the starvation -- p90 nearly halved, the worst case more than halved -- but added no capacity, so the distribution converged on the mean rather than shifting down, which is why the median rose. Throughput is unchanged. The same convergence now shows on the front of the critical path, where the two debian-13, s jobs used to clear in about three minutes:

s job wait Before After
Median 3 min 11 min
p90 10 min 54 min
Max 49 min 99 min

652's run holds both of the worst post-fix observations:

build-and-test waited 99 minutes and package-build 54, so 153 of its 362 minutes were spent before the matrix was even queued. The run itself finished success 58 minutes after the ejection, 420 minutes after its merge group was created.

What the survey found: there is no data copy to cache

The first thing to check was whether each leg pays a large fixed cost before testing -- a testdata clone, an image pull, a package install -- that a cache could remove. It does not. Step times from the Debian 12 leg of run 38206699440:

Step Time
Set up job, checkout 7 s
tools/ci/prepare-testdata.sh 88 s
Resparsify test images 6 s
tools/ci/install-docker.sh 21 s
Download the package artifact 5 s
Run the suite on debian:12 2539 s

Inside that last step, pulling debian:12 and installing the package plus its test prerequisites -- 418 packages, because qemu-utils drags in most of a desktop -- accounts for about three minutes. The suite itself reports Ran: 3588 tests in 2349.5103 sec.

So about three minutes of a forty-two minute leg is setup. A perfect cache of every byte fetched before the suite starts would buy two minutes. This is not where the time is.

The testdata step deserves its own note, because the obvious fix for it is already written and dead. tools/ci/prepare-testdata.sh has two branches: update a cache at $TESTDATA_CACHE (/srv/ci/cached/instar-testdata) in place, or clone fresh into the workspace. The job log takes the second every time --

No cache at /srv/ci/cached/instar-testdata, cloning fresh...
Cloning into '/srv/ci/_work/instar/instar/instar-testdata'...
Updating files: 100% (769672/769672)
Filtering content: 100% (308/308), 7.46 GiB | 133.88 MiB/s, done.

-- because the sfcbr runners are fresh VMs, so nothing persists at that path and the update-in-place branch never fires. Each leg checks out 769,672 files and pulls 7.46 GiB of git-LFS content, taking a median of 82 seconds across 28 legs (72 s to 129 s).

Seven legs per merge group is about 52 GiB of LFS transfer, and the five pull-request jobs that also prepare testdata add roughly 37 GiB per pull request. That is a real cost and worth removing, but it is not this plan's cost: the legs run in parallel, so it is about 80 seconds of the critical path. Recorded under Deferred work, where it belongs -- it is a runner-image change, not an instar change.

Where the time is: one worker, and six tests

The suite runs at --concurrency 4. Per-worker figures from the same leg, with the execute totals derived from the per-test lines and agreeing with stestr's own Worker Balance block to the second:

Worker Execute Wall
0 2197 s 39:09
3 1490 s 24:53
2 1367 s 22:49
1 913 s 15:14

The leg's wall time is worker 0's wall time, and workers 1 to 3 finish between 14 and 24 minutes earlier and then idle. Even distribution of the 5967 seconds of execute time would be 1492 seconds per worker, so roughly twelve minutes of every leg is scheduling imbalance rather than work.

The imbalance has a single cause. Worker 0 drew all three VirtualPC tests:

Test Time Worker
TestConvertVhdToQcow2Roundtrip.test_virtualpc_vhd_qcow2_roundtrip 609 s 0
TestConvertVhdToRaw.test_convert_virtualpc_vhd 505 s 0
TestConvertVhdCompare.test_compare_virtualpc_vhd_vs_raw 310 s 0

That is 1424 of worker 0's 2197 seconds. tests/.stestr.conf sets only test_path and top_dir, and the stestr repository is created fresh under /tmp in each container, so stestr has no prior timings to bin-pack from and these land wherever the split puts them. The same imbalance appears in a local run of the suite on this host (1520 tests on one worker against 510 on another), so it is systematic, not a property of CI. It has simply never mattered, because the suite takes six minutes locally.

Those three tests have three Hyper-V siblings, and the six together are half the suite:

Class Tests Execute
TestConvertVhdToQcow2Roundtrip 2 1233 s
TestConvertVhdToRaw (hyperv, virtualpc) 2 1064 s
TestConvertVhdCompare (hyperv, virtualpc) 2 648 s
Subtotal 6 2945 s of 5967

By module, test_convert is 5045 of the 5967 seconds in 248 of 1684 timed tests; everything else in the suite is under a thousand seconds. The remaining 30 tests of the convert-vhd partition are 45 seconds in total.

The two fixes are the same fix, twice

Removing those six tests changes the per-worker picture to 866 / 808 / 773 / 577 seconds against an even split of 756 -- a worst worker 15% over even, instead of 47% over. The imbalance is caused by the six tests, so the two findings above are one finding. In sequence:

Worst worker Leg
Today 2197 s 42 min
Timing data only ~1492 s ~30 min
Six tests nightly only 866 s ~16 min
Both ~756 s ~15 min

Balancing first does deliver about twelve minutes, because the six tests are still there to be balanced. But once they move, balancing is worth about another ninety seconds. Michael chose the balance-then-nightly order knowing this; the plan keeps it, and scopes step 1 accordingly -- as the guard that stops a future heavy test silently recreating this, not as the performance fix.

Why packing is no longer first

The first draft of this plan packed the seven legs into three jobs to cut xl acquisitions from seven to three. That is still a real lever -- with ordering fair, acquisition count is what the critical path is made of -- but it is now second order. At a 42-minute leg, seven legs through instar's effective share of about three slots is three waves, and the matrix stage of run 38206699440 took 235 minutes. At an 18-minute leg it is about 54 minutes for seven legs in three waves against about 48 for three packed groups in one. The gap mostly closes on its own, so packing is a decision to take after the measurement in step 5, not before it. The packing analysis is preserved under Deferred work so it does not have to be redone.

Mission and problem statement

Get the merge group's critical path far enough under the 360-minute check_response_timeout_minutes that a busy fleet does not eject green pull requests, by removing work from the gate rather than rearranging it. Change which tests gate a merge; change nothing about what is tested, only when.

Target, with every term measured in step 5 rather than assumed: build-and-test 21 min, package-build 7 min, a matrix leg about 18 min, and seven legs through three slots about 54 min, for a critical path near 85 minutes of work against the 420 observed. The queue wait is not in instar's gift and the capacity direction in #543 remains its complement.

Open questions

None blocking. The judgement a reviewer should attack is Decision 3: six tests that are arguably the matrix's whole purpose stop gating merges.

The disk interface was open when this plan was drafted and is now settled; Decision 8 records it. The release gate that followed it -- step 7 could not merge until private-ci's conductor phase was deployed (Decision 9) -- has cleared, and Decision 9 records the three pieces of evidence.

One scope correction worth carrying, because it was wrong in the first exchange with that session, and a second correction on top of it. Seven places prepared testdata when that exchange happened, not five: package-matrix, integration-core, integration-convert-qcow2, integration-convert-vhd and oslo-crossval-master in functional-tests.yml, plus coverage-fuzz.yml and test-drift-fix.yml. package-smoke and snapshot-harnesses do not. Step 3 then added two more, because the nightly has two shapes of leg: nightly-legs and measure in nightly-matrix.yml. Nine jobs prepare testdata, and eight of them carry the label -- the exception is test-drift-fix.yml, immediately below. The set is asserted in both directions rather than trusted: a consumer without the label pays for a 7.46 GiB clone it did not need, and a labelled job that is not a consumer takes a scarce disk-bearing runner for nothing.

test-drift-fix.yml is the exception and must stay one. [self-hosted, claude-code] is the static fleet, managed by 33fl's static_runner.yml; the conductor only watches it and never attaches anything to those VMs, so no static runner advertises instar, and a job carrying the label would queue until GitHub cancels it 24 hours later. It keeps cloning fresh. Because that is an inconsistency a later reader will want to tidy away, step 7 records the reason in the workflow itself and not only here. Seeding /srv/ci/cached/instar-testdata once per static VM would let the existing update-in-place branch work there too, but it is only safe while each VM runs one job at a time, and it is 33fl's change -- tracked in private-ci's plan, not here.

Decisions

  1. Seed stestr with timing data, as a guard rather than an optimisation. Without it the scheduler cannot bin-pack, so any future test over a few minutes recreates the single-slow-worker failure mode, invisibly -- the suite just gets slower. Worth about ninety seconds once Decision 3 lands, and worth having anyway for that reason.

It must be derived, not hand-maintained. This repository has already been bitten by hand-maintained figures drifting (the mutation harness's case counts drifted three review rounds running, and are now computed). A committed timing file refreshed by the nightly job in Decision 2 satisfies that: the nightly runs the suite anyway, so it can publish the timings it measured.

  1. A nightly cross-distro job, in the shape of differential-fuzz.yml: schedule: plus workflow_dispatch, issues: write, and a failure that files or updates an issue. A nightly whose red is only visible in the Actions tab is not a safety net, so the issue-filing step is part of the job and not a follow-up.

Settled while building it, and recorded here because the back brief asks for the workflow-file question in writing:

  • Its own file, .github/workflows/nightly-matrix.yml. needs: cannot cross workflow files, and package-build is gated to merge_group || workflow_dispatch, so a scheduled job could not consume its artifact from either side of that boundary. The nightly builds its own packages, as differential-fuzz.yml builds its own binaries. Adding schedule: to functional-tests.yml would also fire every job there whose condition begins always(), starting with can_enqueue.
  • Two shapes of leg, because D1 and D3 pull against each other. D1 assumes the nightly runs the whole suite and can therefore publish the timings it measured; D3 makes it run six tests. Both hold: seven distro legs run the six moved tests, which is the coverage, and one more leg runs the whole suite on Debian 13, which is the measurement. That leg is redundant as coverage and is not there for coverage -- it is the only job left in CI that executes the whole suite in a single stestr repository, so it is the only place the timing file can be derived from. The workflow says so, because a reader will otherwise delete it.
  • The measurement leg does not seed the timings it measures. stestr keeps one duration per test id and only the tests that execute update theirs, so a seeded repository hands back the seeded figure for everything that did not run: a deleted test's duration would live on forever, and a test that silently stopped running would never lose its old one. Setting STESTR_TIMING_OUT therefore turns seeding off for that run, which costs it an unbalanced partition and nothing else.
  • The refresh is a pull request, never a push to develop, and only when the measurement moved materially. "Materially" is defined on each test's share of the suite's weight rather than on seconds, because stestr's bin packing is scale-free: a uniformly slower runner changes every number in the file and not one scheduling decision. One test moving two points of the suite's weight (about 100 seconds, against a worker's quarter share of 25 points), or a tenth of the weight relocating between tests, is material. Everything else is noise, and the file is only a scheduling hint -- a stale one degrades packing gradually and can never make a run wrong -- so the default is silence.

  • The six heavy VHD conversion tests move off the merge gate and run nightly on all seven distros. They are the Hyper-V and VirtualPC roundtrip, to-raw and compare cases.

This is the decision that costs something, and the cost is real: those conversions are where a distro's qemu-img is most likely to differ from instar, which is close to the matrix's reason for existing. Three things make it the right trade anyway. They already run on every pull request through integration-convert-vhd on debian-13, so an instar-side regression is caught at PR time regardless of this change. The distro axis moves when a distro ships a new qemu, not when instar changes, so a per-merge cadence is far finer than the signal. And a nightly surfaces a distro divergence within 24 hours, against a status quo where the whole queue intermittently ejects green work and nothing lands at all.

Only the six move, not the convert-vhd partition: its other 30 tests are 45 seconds, and moving them would buy nothing while making the merge-queue selector harder to read.

  1. The merge-queue matrix gets an explicit selector, and the nightly gets its complement, both expressed as Makefile test-container-* targets like the existing three so that tools/ci/check-test-partition.py reads them from the one place they are defined.

  2. Extend the partition guard to the merge queue and the nightly. It discovers pull-request jobs today, so the six tests staying claimed by integration-convert-vhd keeps it green and it would not notice the matrix selector dropping something no other queue job covers. The silent loss of a whole module from the gate is this plan's worst failure mode and has no symptom -- CI goes green faster. The guard must assert that the merge-queue selector and the nightly selector together cover what the matrix covers today.

  3. The superset argument is amended, not deleted. functional-tests.yml:33-43 records that the queue's coverage is a strict superset of the pull-request integration jobs, with one documented exception for the libvhdi oracle. After this change there is a second exception, and it is bigger. Say exactly what it is, where the moved tests run instead, and at what cadence.

  4. Packing is deferred to a decision after step 5, not planned here. See Deferred work.

  5. Consume the testdata dependencies disk (step 7). Each job that prepares testdata clones 7.46 GiB of git-LFS content and checks out 769,672 files, a median of 82 seconds; that is about 52 GiB per merge group. private-ci is adding a dependencies disk, and its contract is settled -- see docs/plans/PLAN-instar-testdata-disk.md in private-ci, section "Contract with instar", which cites the measurements above. As agreed with that work:

  6. Requesting it: add instar to runs-on, e.g. [self-hosted, debian-13, xl, instar]. The conductor matches labels as a set, so position does not matter. Michael chose a label over a size token (xl-instar) knowing a plain [debian-13, xl] job can then take an instar runner; the conductor counts those.

  7. Finding it: nothing to do. Userdata mounts it before the runner registers.
  8. Path: /srv/ci/cached/instar-testdata, writable -- a per-runner copy-on-write overlay of a label image, discarded with the runner. prepare-testdata.sh's update-in-place branch needs no change.
  9. Contents: a depth-1 clone of main with LFS materialised in both the working tree and .git/lfs/objects, which is what keeps lfs pull incremental. Rebuilt nightly, so at most about a day stale. Owned by the runner's debian user, which is the user the jobs run as, so git's safe.directory check is satisfied. Carries no credential: the build strips the GitLab token from .git/config, including the [lfs "https://oauth2:...@..."] section git-lfs writes, so prepare-testdata.sh's existing git remote set-url with the job's own token is what authenticates. The existing fetch, reset and lfs pull stay exactly as they are.
  10. Already resparsified, but only downloaded/ and only *.qcow2, *.vmdk, *.vhd, *.vhdx and *.img -- the image build mirrors instar's own step at functional-tests.yml:702-715, deliberately leaving custom/ fixtures with the allocation their tests expect.

    That mirroring was a silent drift hazard -- an extension added to instar's list would not reach the image build, and would show up only as slower jobs -- so it is being removed rather than documented. Once tools/ci/resparsify-testdata.sh is on the default branch, private-ci's image build will fetch and run it instead of carrying a copy; the build machine has no instar checkout, but instar is public, so it fetches over HTTPS and runs the script as debian against the clone. A fetch failure fails the build, which turns a rename or removal into a failed nightly with an issue rather than into slower jobs.

    This makes the script a cross-repository interface, and step 7 owns keeping it stable: one positional argument (the tree path), no reliance on GITHUB_* variables, and a non-zero exit on failure. instar's own cache-path needs (resparsify only the changed files) must therefore be expressed as additional optional arguments or a flag, leaving the one-argument call meaning "the whole tree" for all time. Until it lands, private-ci ships the copied loop.

Two things instar owes in return, and both are the interesting part of step 7 rather than the label:

  • TESTDATA_REQUIRE_CACHE=1. Their request, and the right one. What it catches is a path mismatch: the disk mounted somewhere other than where we look, or a runner that advertised the label without the disk. Without the flag either of those degrades to a silent 7.46 GiB clone that merely looks slow -- the same shape as the bug this whole plan is about. With it, that is an infra error in the idiom prepare-testdata.sh already uses for a non-materialised LFS tree.

    It does not catch a failed mount, and the message must not say it does. That session confirmed the sequencing: a mount failure makes their userdata print CONDUCTOR-CACHE-DISK-FAILED and stop before the runner registers, so the job stays queued and never reaches our script at all. A message blaming a mount would send the next person to read userdata logs for an event that cannot have happened. The assertion therefore names /srv/ci/cached/instar-testdata literally rather than inheriting the default from TESTDATA_CACHE, so that a change on either side of the contract fails the assertion first. - Do not resparsify the whole tree over the overlay. Their catch, and it would have silently eaten most of the saving: the "Resparsify test images" step does cp --sparse=always then mv over every image under downloaded/, which on a copy-on-write overlay writes those bytes into the overlay. Skipping it on the cache path outright is wrong in the other direction, though -- the image is resparsified at build time, but the objects the job's own lfs pull fetches are not, so a day of drift would accumulate fully allocated. What the cache path needs is the changed files and nothing else, which means prepare-testdata.sh has to report both which branch it took and what the update changed. Neither of which it did.

  • Step 7 must not merge before private-ci's conductor phase is deployed. This is a hard sequencing constraint, not a preference. A conductor that does not know the instar label buckets the job as plain debian-13/xl and starts runners that never advertise instar, so GitHub never assigns the job and it waits out a 24-hour cancellation. That is strictly worse than the ejections this plan exists to fix. The gate is private-ci#144 merging and soaking for 12 hours, and the ci-instar-testdata session will say when it has.

The gate cleared on 2026-10-16, and all three of the conditions it names were met rather than two of three:

Condition Evidence
Deployed private-ci #179 live on maui, 2026-10-16 17:22 AEDT
Probed a job on [self-hosted, debian-13, s, instar] assigned and run, 17:26 AEDT
Soaked 12 hours clear, to 2026-10-16 18:22 UTC

Their build side is done too, which matters because the held half assumes it: shakenfist/actions #166 and #167 are merged, so the nightly disk build now fetches instar's resparsify-testdata.sh from develop and runs it against its own clone, after scrubbing the GitLab token out of that clone. The cross-repository interface Decision 8 fixed therefore has a live consumer, and the copied loop that stood in for it is gone.

Because it is a sequencing constraint and not a property of the code, it gates only the part of step 7 that requests the label. Everything else in that step is independent of whether the disk exists, so it lands first; the step 7 row carries the split.

Two amendments that session supplied to the contract in Decision 8, recorded here because they change what the held half has to do:

  • Contract item 1 ("add instar to runs-on") is verified for debian-13 only. Any job requesting the label must request debian-13 alongside it. Every testdata consumer here already does, so this costs nothing today -- but it means the label is not a free addition to a leg on some other image.
  • instar has to be in .github/actionlint.yaml before any runs-on names it. actionlint rejects an unknown self-hosted runner label, and it runs in pre-commit, so without the entry the labelled change cannot be committed locally at all. The entry is therefore in the landed half: permitting a label changes no job's behaviour.

Execution

Step Effort Model Isolation Brief for sub-agent
1 medium sonnet none Derived stestr timings (D1). Decide the mechanism by reading stestr's scheduler rather than guessing: stestr partitions from timings held in its repository, so the options are a committed timing file loaded into a fresh repository before stestr run, or an explicit worker assignment. Implement whichever stestr actually supports without a hand-written test list, in tools/test-package-functional.sh around the existing STESTR_ARGS construction at line 281, skipping cleanly when the file is absent so a developer checkout still runs. Add a tools/ci/ self-test in the shape of the existing tools/ci/test-*.sh, asserting the timing file is consumed and that a missing file is not an error. Prove the effect by running the suite on this host twice, before and after, and quoting stestr's Worker Balance block both times -- the host run shows the same imbalance (1520 tests on one worker against 510), so it is reproducible in six minutes without CI. Do not change concurrency in this step.
2 medium opus none The selectors (D3, D4). Add two Makefile targets beside the existing test-container-core, test-container-convert-qcow2 and test-container-convert-vhd at Makefile:681-775: one for what the merge queue runs and one for what the nightly runs. The nightly's selection is exactly the six tests of TestConvertVhdToQcow2Roundtrip, TestConvertVhdToRaw and TestConvertVhdCompare whose fixtures are the Hyper-V and VirtualPC images -- name them by test id, not by class, because each of those classes also holds sub-second cases that should stay on the gate. The queue's selection is the complement. Thread the queue selector into tools/ci/run-matrix-entry.sh; note that MATRIX_SELECT is explicitly reserved for local partial runs and must not be reused for this, so add a separate variable and keep MATRIX_SELECT's warning intact.
3 medium opus none The nightly job (D2). A scheduled cross-distro job over the same seven-distro list, reusing package-build's artifact or rebuilding, running the step-2 nightly selector. Copy the structure of differential-fuzz.yml for schedule:, workflow_dispatch:, issues: write and the failure reporting: a red nightly must file or update an issue naming the distro and the test. Publish the timing data step 1 consumes (D1) as part of this job. Decide and record whether it lives in functional-tests.yml or its own workflow file -- needs: cannot cross workflow files, which is the constraint that matters.
4 medium opus none The guard (D5). Extend tools/ci/check-test-partition.py so its discovered job set includes the merge-queue matrix and the nightly, and so it asserts their selectors together cover everything the matrix covers today. Keep its stated principle intact: the job set is discovered from the workflow and the selectors read from the Makefile, never a second copy. Extend tools/ci/test_check_test_partition.py with a case per new failure mode: a test claimed by no queue job and no nightly job; a nightly selector that silently overlaps the queue's; a matrix selector that drops a whole module. Add the guard's invocation to the ci-tooling job if the existing invocation does not already cover the new assertions.
5 medium opus none Done: dispatched as workflow run 38818648724; median clean leg 16m31s against the 42-minute baseline, and the comparison is posted on #543. See "The step-5 measurement" below for the legs and the two caveats. Measure (the point of the plan). Dispatch the workflow and record, by the same method as Situation: per-leg step times, the suite's wall time, stestr's Worker Balance block, the matrix stage span and the total. Compare against this run's 42-minute leg, 39:09 suite, 2197/1490/1367/913 worker split, 235-minute matrix stage and 420-minute total. Post the comparison to #543. If the leg does not reach roughly 18 minutes, say so plainly and do not tune the selector to make the number look better -- the selector is a coverage decision, not a dial.
6 low sonnet none Documentation. Amend the superset argument at functional-tests.yml:26-53 per D6 -- state the second exception, where the six tests run instead, and at what cadence. Update docs/testing.md:418-457, which describes the distro matrix and how to reproduce a CI entry: the entry-level command is unchanged but what the queue selects is not, and the nightly is a new thing to document. Record the measured per-distro suite medians (30 to 38 min, every distro's max above the slowest median) so a later reader can check whether the spread is still narrow. ~~No CHANGELOG.md entry: nothing user-visible changes.~~ Reversed during step 8, on audit advice: there is an entry, under Changed. The original call read "user-visible" as "visible in the binary", and nothing in the binary changes. But the person this is visible to is a contributor, and what they need is discoverable only from the changelog: a VHD change that passes the merge queue and then turns the nightly red has found a per-distro qemu divergence rather than a flake, and the six tests moving off the gate is why the two can now disagree. Finding that out from a GitHub issue filed overnight, with no record of the change in behaviour, is the failure the entry prevents.
7 medium opus none Done, in two commits: the half that does not request the runner label, then the half that does once the gate cleared. The testdata dependencies disk (D8, D9). First commit: the resparsify step out of YAML and into tools/ci/resparsify-testdata.sh, with the comment naming private-ci's image build as a cross-repository consumer (D8) and a tools/ci/test-resparsify-testdata.sh exercising their calling convention (done in the branch that did steps 1 to 6 and 8 -- do not redo the lift); prepare-testdata.sh reporting which branch it took as TESTDATA_SOURCE, and on the cache branch the paths the update changed as TESTDATA_CHANGED_FILES, because the reset that changed them is the only moment that set can be derived; the narrowing itself as further optional arguments to resparsify-testdata.sh (--files-from <list>, trailing named paths, --list-extensions), leaving the one-argument whole-tree call byte-identical for private-ci (D8); TESTDATA_REQUIRE_CACHE implemented -- asserting /srv/ci/cached/instar-testdata literally, and diagnosing a path mismatch rather than a failed mount, which cannot reach it -- and set in no workflow; tools/ci/test-prepare-testdata.sh, which stubs git and proves the require-cache refusal with the cache absent, wired into ci-tooling; instar in .github/actionlint.yaml, which has to precede any runs-on that names it (D9) and changes no job's behaviour; and the reason test-drift-fix.yml stays unlabelled, recorded in that workflow rather than only here, because the reader about to tidy the inconsistency away is looking at the workflow. Second commit, once the Decision 9 gate cleared: instar on the runs-on of the eight testdata consumers that can ever be assigned a disk-bearing runner -- package-matrix, integration-core, integration-convert-qcow2, integration-convert-vhd and oslo-crossval-master in functional-tests.yml, nightly-legs and measure in nightly-matrix.yml, and coverage-fuzz in coverage-fuzz.yml, all of them already [self-hosted, debian-13, xl], which is what the label is verified against; TESTDATA_REQUIRE_CACHE: '1' on each of those eight, in the prepare step's env beside the token it already passes; and the narrowing wired up through a new tools/ci/resparsify-prepared-testdata.sh, which reads TESTDATA_SOURCE/TESTDATA_CHANGED_FILES and calls the resparsifier whole-tree for a clone and --files-from for a cache. A script rather than a conditional in each step for three reasons: the resparsifier cannot branch on it itself, because it reads no environment variable by cross-repository contract; eight copies of the decision in YAML is eight places to drift with no symptom, which is the same hazard that made the resparsify loop a shared script; and a workflow step cannot be tested, whereas tools/ci/test-resparsify-prepared-testdata.sh measures allocated blocks on the files a run was not supposed to touch as well as the ones it was, and is wired into ci-tooling. All eight resparsify call sites moved to it at first, test-drift-fix.yml's included; review then moved that one back to the one-argument form (e5066c21), because that workflow runs from the default branch against a pull request's own scripts, and a branch older than the wrapper would have no wrapper to call. Seven call sites use it, and the reason for the eighth is recorded in that workflow. The contract items this satisfies are the request (item 1), the path (item 3), the require-cache ask (item 5) and the scope (item 6: the pull-request jobs are labelled too, since every job carrying the label gets the disk). After it merged: the before/after measurement, taken over all 21 legs of the three merge groups that followed rather than one leg, is under "The step-7 measurement" below and on #543; the ci-instar-testdata session has been told the labelled half has landed. Not labelled, on purpose: test-and-fix in test-drift-fix.yml, which runs on the static fleet the conductor only watches, so no runner there will ever advertise instar and a labelled job would wait out a 24-hour cancellation (recorded in that workflow, not only here); and ci-tooling, which greps like a consumer because it runs tools/ci/test-prepare-testdata.sh, but that self-test stubs git and touches no testdata at all.
8 high opus none Push audit: run PUSH-AUDIT.md over git diff origin/develop...HEAD. Findings are fixed in this branch before the PR, or declined in writing here.

Commits: the plan; then one per step. Every commit passes pre-commit run --all-files.

The step-5 measurement

Dispatched as workflow run 38818648724. The comparison is posted on

543; this is the record of it.

Leg Wall
fastest 14m07s
15m03s
median 16m31s
18m55s
slowest 21m38s

Five legs ran clean, median 16m31s against the 42-minute baseline in Situation. That meets the success criterion of "about 18 minutes, measured", and it is the number the plan was written to produce.

Two things about the run are not the change's doing, and both have to be said rather than averaged away.

  • Two legs failed, on the load-flakiness this repository has already documented, in test_convert re-encode cases. Attributed by measurement, not by assumption: the same tests passed in 84 to 138 seconds on a green leg of the same run and took 484 to 610 seconds on the red ones, which is the signature of host contention rather than a behavioural difference.
  • The stage span and the total are not comparable to the 235 and 420 minute baselines. The first leg waited 1h52m for a runner, so what the run measures end to end is the fleet's queueing, not the suite. The per-leg wall times above are the figures this step set out to move, and they are measured on the legs themselves.

The step-7 measurement

Taken after #673 merged, from the three merge groups that followed it (runs 39020749854, 39092387730 and 39105118492): all 21 matrix legs ran on a disk-bearing runner and reported testdata source: cache. The baseline is the 14 cloning legs of runs 38818648724 (the step-5 dispatch) and 38862171039 (the first merge group after #671). The comparison is posted on #543.

Prepare instar-testdata Legs Median Range
Fresh clone (before) 14 1m30s 1m14s - 3m18s
Disk current with testdata main (18 Oct) 14 1m09s 0m57s - 1m41s
Disk a day behind main (17 Oct, 643 paths changed) 7 3m07s 2m51s - 6m40s
  • The transfer saving is real; the critical-path saving is about 21 seconds, not the 80 Decision 8 expected. A current disk moves no LFS content at all. What remains is git walking a 770,000-file tree with nothing to do: in one leg, about 19 s of diff-files and fetch, 1 s of reset, and 37 s of git lfs ls-files and an empty git lfs pull. Leg wall clocks do not show the saving, because the suite's spread under host contention (12 to 27 minutes on clean legs) is far wider.
  • A day-stale disk is slower than a clone. On 17 Oct the fetch took 20 to 80 s and git reset --hard 2 to 4 minutes for 643 changed paths. Recorded under Deferred work with the hypothesis, which is not measured.
  • The index survived the handoff. The stat-dirty warning fired only on 17 Oct, at 59 tracked paths of which 59 were in-scope images -- the build's own resparsify, not a lost index, which would read near 770,000. The 18 Oct legs report none, which matches the git update-index --refresh that shakenfist/actions' ansible/ci-instar-testdata.yml now runs after resparsifying, so that ask no longer needs passing on. No leg reported LFS pointers.

The second push audit

Step 8's audit ran at 2f8d7aaa; four review-round commits followed it into #673 unaudited (7d67c57d, 3b8989d8, 17833e2c, e5066c21). PUSH-AUDIT.md was re-run over 2f8d7aaa..e5066c21 after the merge. It found no code defect -- shellcheck, actionlint and the four testdata self-tests pass, and the git lfs ls-files parse was checked against a real git-lfs 3.6.1 -- and five documentation errors, all fixed in the close-out commit:

  • Three places still counted eight resparsify call sites or eight failing jobs after e5066c21 moved test-and-fix back to the one-argument form and left seven (docs/testing.md, test-drift-fix.yml, resparsify-prepared-testdata.sh's header).
  • resparsify-testdata.sh still said a symlink is judged only by its target. Since 17833e2c's string filter a relative path must also pass on its own name, so a link like downloaded/a.raw -> a.qcow2 is dropped from a list and refused when named; the header, two inline comments and docs/testing.md now say so, and the classify comment is back above classify.
  • test-testdata-changed-files.sh described two sources for the changed-file list after 3b8989d8 added a third, and the step-7 row above did not record e5066c21's reversal.

Review checklist additions

  • Every test that runs in the merge-queue matrix today runs either in the queue or in the nightly after this change, and the guard fails if that stops being true. Proved by the step-4 self-test, not by reading the selectors. Checked at close-out: tools/ci/test_check_test_partition.py passes its 40 cases, and deleting one of the six ids from test-container-matrix-nightly's regex makes tools/ci/check-test-partition.sh exit 1 naming exactly that test; restored, it passes.
  • All seven distros still run in both the queue and the nightly. A distro dropped during the change is the failure mode with no symptom. Checked: the guard reports both distro lists agree on seven, and nightly run 39080337878 ran a leg for each.
  • A red nightly produces an issue. Proved by running the failure path, not by reading the step. Proved by the real thing: the #778 kernel regression described in Status above filed #780 to #786, one per distro, each naming the distro and its six failing tests.
  • MATRIX_SELECT is still reserved for local partial runs, still warns, and is set nowhere in CI. Checked: no occurrence under .github/, and tools/ci/run-matrix-entry.sh still prints its partial-run note when it is set.
  • The six moved tests are named by test id. A class-level selector would also move that class's sub-second cases off the gate for no gain. Checked: test-container-matrix-nightly's regex is six literal test_convert.<Class>.<test> ids.
  • The set of jobs carrying the instar label is exactly the set of jobs that run prepare-testdata.sh, minus the static-fleet one that can never be assigned such a runner. Checked in both directions by parsing the finished YAML, not by reading the diff: a consumer without the label pays for a clone it did not need, and a labelled non-consumer holds a scarce disk-bearing runner for nothing. ci-tooling is the trap -- it greps like a consumer and is not one. Done, by loading every workflow with a YAML parser and comparing the two sets: eight labelled jobs, all nine consumers accounted for, both exceptions (ci-tooling, which tests the script, and test-and-fix, which cannot be given the disk) matching their documented reason, and every labelled job also carrying debian-13 and TESTDATA_REQUIRE_CACHE: '1'. This is a one-off check and not a standing guard, which review was right to press on; #674 tracks making it one, and docs/testing.md now says plainly that nothing enforces it.

Risks and mitigations

Risk Mitigation
A module or distro silently stops gating; CI goes green faster and nothing fails D5's guard extension, with a self-test case per failure mode. This is the plan's worst outcome and the only one with no symptom. Owner: step 4.
The nightly goes red and nobody notices D2 makes issue filing part of the job, and the review checklist requires the failure path to be exercised rather than read. Owner: step 3.
A distro-specific VHD conversion divergence lands and sits for up to a day Accepted, and it is the price of D3. Bounded by the tests still running per-PR on debian-13, so only the distro axis is delayed.
Step 1 picks a timing mechanism stestr does not really support, and the balance silently does not change Step 1 proves the effect from stestr's own Worker Balance block on this host, before and after, where the whole suite is six minutes. No CI round trip needed. Owner: step 1.
The leg does not reach 18 minutes and the queue is still near the limit Step 5 reports it either way, and packing is held in Deferred work for exactly this case rather than being spent in advance.
Step 7 merges before private-ci's conductor knows the instar label, and every labelled job queues 24 hours then cancels D9 makes this a release gate, not a judgement call: the ci-instar-testdata session confirms deployment first. The step is last in the table and the back brief says to land steps 1 to 6 without it rather than hold the pull request. Owner: step 7. Discharged: deployed, probed on a live instar job and soaked 12 hours before the labelled half was written -- see the table in D9.
The resparsify step copies 7.5 GiB into the copy-on-write overlay and gives back most of the disk's saving D8: on the cache path resparsify only the files the update changed -- not the whole tree, and not nothing either, since the objects the job's own lfs pull fetches land fully allocated. That requires prepare-testdata.sh to report both which branch it took and what changed, and resparsify-testdata.sh to take a narrower request without disturbing its one-argument form. Found by the ci-instar-testdata session, not by this plan -- worth noting as evidence that the disk's value is easy to lose silently. Owner: step 7, first commit; wired up in the second.
tools/ci/resparsify-testdata.sh's interface changes and breaks private-ci's nightly image build D8 makes it a named interface with a self-test in their calling convention, and the script says who consumes it. Their side fails loudly rather than degrading, by design. Owner: step 7.
Someone later gives test-drift-fix.yml the instar label for consistency, and it queues 24 hours then cancels The reason goes in that workflow next to the job, not only in this plan: a reader about to make the change is looking at the workflow. Owner: step 7.
Someone later "fixes" the gating by putting the six tests back D6 records the reason in the workflow comment that already warns readers off re-running everything everywhere, which is where someone about to do this will be looking.

Administration and logistics

Success criteria

  • A matrix leg is about 18 minutes, measured, down from 42.
  • Every test that gates a merge today either still gates or runs nightly on all seven distros, and a guard fails if that stops being true.
  • A red nightly files an issue naming the distro and the test.
  • stestr's Worker Balance on the slowest worker is within about 20% of the even split, measured.
  • The superset argument in the workflow states its second exception accurately.
  • pre-commit run --all-files passes and ci-tooling runs the new self-tests.
  • The step-5 measurement is on #543, whichever way it came out. #543 is not closed by this change: the capacity direction is the other half.

Deferred work

  • Pack the matrix legs into three jobs (D7). Analysis, kept so it need not be redone: group by package kind, 2 / 2 / 3 -- deb-a (Debian 12, Ubuntu 22.04), deb-b (Debian 13, Ubuntu 24.04), rpm (Fedora latest, Rocky 9, Rocky 10) -- which keeps each group homogeneous and preserves run-matrix-entry.sh's per-kind log naming. Balance by count, not duration: the per-distro medians are 30 to 38 minutes and every distro's max exceeds the slowest median, so a duration fit would be fitting noise. Keep the job key package-matrix, since can_merge at functional-tests.yml:1335 depends on it and the comment there records that this name, not the per-entry names, is what branch protection requires. Two constraints a packed matrix must meet: every distro in a group runs whatever the earlier ones did, or a seven-distro signal collapses to "first failure wins"; and the per-distro allow_failure quarantine must move out of job-level continue-on-error into the group runner, because a job-level flag would disable a whole group's gate -- which is the sharp edge the comment at functional-tests.yml:632-641 already warns about.
  • A standing guard on the instar label set (#674). The correspondence between labelled jobs and testdata consumers is checked by hand; both directions of drift are silent, and the worst case -- the label on the static-fleet job -- queues for 24 hours before GitHub cancels it. Deferred rather than written here because the right shape is one PyYAML reader serving this and check-test-partition.py's existing hand-rolled scan, which means adding PyYAML to that script's venv; a third hand-rolled scan would be the wrong direction. The checks themselves are written out in the issue.
  • Refresh the index on the runner rather than rewriting (#675). prepare-testdata.sh unions the stat-dirty set into the changed-file list so the narrow resparsify shrinks what the reset re-expanded, which is correct but pays twice: the reset writes each file into the overlay and the resparsify writes it again. A git update-index -q --refresh before the fetch would re-hash those entries instead, so the reset leaves them alone. Deferred because the trade is unmeasured -- re-hashing goes through the LFS clean filter, so the worst case is hashing 7.46 GiB rather than writing it, and which is cheaper depends on the runner. The union stays either way as the backstop. The step-7 measurement makes this rarer than it looked: the disk build now refreshes its own index, and every leg on a disk built that way reported no stat-dirty paths. The trade only comes back if that build step regresses.
  • Make a stale disk no slower than a clone (#790).
  • What was measured. On a disk a day behind testdata main, git reset --hard takes 2 to 4 minutes for 643 changed paths, and the prepare step 3m07s against a clone's 1m30s.
  • Why the disk is stale. Testdata main moves twice a day, both times from coverage-fuzz.yml: a one-file "Coverage fuzz run started" commit at the start of the run, which is its write check, and the corpus push at the end, which is the change that costs. The run's 04:00 UTC cron fires late (created at 08:11 to 11:35 UTC over 11 to 18 Oct) and runs about eight hours, so the corpus push lands at about 16:25 to 17:10 UTC. The disk is rebuilt last in private-ci's nightly image cycle, which starts at 13:11 UTC and reaches it at about 15:05 UTC (per the ci-instar-testdata session, from conductor/imagebuilder.py), so every corpus push misses it: a day's corpus is missing from the disk for about 22 hours. The 643 paths of 17 Oct were most likely the previous day's 16:25 UTC push of 583 corpus entries plus the OVA corpus.
  • The window: private-ci's to close, agreed and not yet built. As of 18 Oct (UTC) the chosen lever, relayed by the ci-instar-testdata session, is private-ci's PLAN-instar-testdata-disk.md phase 5, which is to rebuild the testdata disk soon after testdata main gains a commit rather than only nightly. That phase was not started then, so until its Execution row reads Complete, expect the window above. Moving coverage-fuzz's schedule is not a fix and is not to be done: the disk is behind from whenever the commit lands until the next build, so an earlier commit only moves the window.
  • On this side, tracked in #790. First, the skip-smudge reset. The hypothesis, not measured: the reset smudges each new LFS object individually where git lfs pull fetches a batch, so GIT_LFS_SKIP_SMUDGE=1 on the reset and the existing pull after it would remove most of the cost. The pointer capture before the pull already lists what that would leave as pointers, so the narrow resparsify would still cover them; tools/ci/test-testdata-changed-files.sh is where to prove it. It is still worth having once private-ci rebuilds on change, because a disk is still briefly behind between a commit and its rebuild. Second, asked for by that session: make the start-of-run write check a non-committing one (a git push --dry-run, or a push to a scratch ref), so testdata main changes once a day rather than twice and private-ci is not rebuilding the disk for one timestamp file.
  • Raise --concurrency above 4. Untested and plausibly the cheapest remaining win once the six tests are gone, but the suite boots a KVM guest per test and docs/testing.md:434,459 warns that co-tenant matrix containers already contend for one KVM host. Needs measuring on an xl runner, not reasoning about.
  • Narrow the rest of test_convert. It is 5045 of 5967 seconds, and a second tranche of twelve manifest and re-encode tests is about 1300 of them. The same argument as D3 applies with less force; revisit only if step 5 says the path is still too long.
  • Co-scheduling, which is probably better than capacity. The other direction recorded in #543 is more xl capacity. A cheaper shape emerged while this plan was being written: private-ci is adding the testdata dependencies disk above, requested by a label on the job, which incidentally gives the conductor a way to recognise instar's merge-queue jobs.

That matters because the post-#66 problem is not unfairness, it is that a merge group's seven xl jobs share one 360-minute deadline the fleet has no notion of. They are served fairly and spread over hours: a 121-minute median wait, 188 at p90, and two legs in #652's run never got a runner inside the window. Seven simultaneous slots is an implausible reservation; "these N jobs belong to one deadline, serve them together" is not. If this plan's steps land first, the ask shrinks to three jobs of about 18 minutes, which is a much easier thing to co-schedule than seven of 42.

Ownership has moved: the ci-instar-testdata session has put this in private-ci's Future work as admission work for its claim-coverage plan, rather than in the disk plan. It is tracked there, not here.

One hazard to carry into that conversation: private-ci#66 records the label dimension as the original starvation axis, which stopped mattering only when retiring the Debian 12 images made debian-13 first in CI_IMAGES; the size half was what the oldest-first fix addressed. A fourth label on the matrix jobs is a new dimension for the provisioner to walk, so the fix needs to order across labels and not only sizes. A label pool with no runners also queues jobs silently rather than failing, which on a merge gate looks exactly like this issue. * Run the docs-only path filter in the merge queue too. The check_paths job runs dorny/paths-filter only if: github.event_name == 'pull_request' (.github/workflows/functional-tests.yml:74,78), and everything else falls back to code_changed=true. The comment at :61-65 records that as deliberate -- "the safe direction, and cheap to revisit if it proves annoying" -- so this is taking up the invitation, not fixing an oversight.

It is annoying now, and measurably. #659 was documentation only: the pull_request run skipped build-and-test and the whole matrix, and the merge group then ran all of it, spending the full fan-out verifying code the change did not touch. That is not merely wasted xl time, it is the 360-minute deadline being spent on a change that cannot fail the suite -- the exact exposure this plan exists to shorten, arriving from a direction none of the five steps covers.

The shape: give the filter step a base of github.event.merge_group.base_sha on a merge_group event so it diffs the group against what the group is being merged into. That is the right granularity rather than a convenient one -- a merge group can hold several pull requests, and base_sha..head_sha computes "docs only" over the whole group, which is what the gate needs to be true of. Verify the action's input names before writing it; this is from its documentation, not from a run.

Two things to check rather than assume. The aggregate must still report success with the matrix skipped -- the pull_request path already proves it does for a docs-only change, and can_merge at functional-tests.yml:1335 depends on the package-matrix job key rather than the per-entry names, so the skip shape is the one already in use. And confirm a label pool with no runners is not how a mis-specified filter fails, because that queues silently rather than erroring, which on a merge gate is indistinguishable from this issue.

Independent of steps 1 to 5 and of private-ci#144: it changes no leg durations and needs no fleet behaviour, so it can land whenever. It is worth noting that it does nothing for a code change, which is every merge group this plan's measurements came from -- it removes a class of run rather than shortening the path. * Cancel an ejected merge group's run once its PR is re-queued. Run 38206699440 held xl runners for 58 minutes past the ejection for a result nothing could use. Belongs to whatever watches the queue; recorded on #543. * The front of the path. The two s jobs went from a 3-minute median wait to 11, and build-and-test waited 99 minutes in #652's run. package-build needs build-and-test only for its devcontainer image; whether that dependency is real is worth checking separately. * The libvhdi oracle is not required on the matrix path, and this plan does not change that. INSTAR_REQUIRE_LIBVHDI: '1' is set only for integration-core (functional-tests.yml:865), which runs make test-container-core on a pull request. The matrix reaches the suite through tools/ci/run-matrix-entry.sh into tools/test-package-functional.sh, and neither sets or forwards the variable, so every libvhdi cross-check on a merge-queue leg skips silently and the leg still reports zero failures. Found while checking what the step 2 selectors keep on the gate; left alone deliberately, because requiring the oracle changes what is tested and this plan's mission is to change only when. It is the same shape as the defect this plan exists to fix, so it is worth its own issue rather than a footnote. * The length floor is a lower bound, not a count. Step 2's fix derives it from stestr list, which enumerates only statically discoverable ids: measured on this tree, a listing of the suite minus test_info_malicious gives 2378 against a run's 3675, because roughly 1300 cases are built at load time. The floor therefore catches gross truncation and not a partial loss. The nightly from step 3 is the one job that executes the whole set, so it can publish the true executed count alongside the timing data and give the floor a tight bound; that is the right home for it and it is not done here. Declined from the push audit, in writing. Two findings were real and not taken. tools/ci/check-test-partition.py has grown from 301 to over 700 lines and has a natural seam -- the Makefile and workflow readers could be a shared library under two check entry points -- but that is a refactor rather than a defect, and this branch's hardening is already larger than the change it hardens. The two stestr self-tests duplicate a venv build and a duration helper verbatim; the duplication is in test scaffolding, costs a reader nothing and risks no behaviour. Both are better done by whoever next needs to touch those files.

Declined from the automated review rounds, in writing. Two further findings were real and not taken.

  • The publishing job runs on a self-hosted runner with persisted credentials. Accepted rather than fixed. It is the only checkout in the workflow that keeps its job token, and that is the point of splitting it off the measuring leg: the job runs no tests, no containers and no testdata, it downloads one derived text file and pushes a branch, and these runners are provisioned per job. The exposure the split was built to remove -- a write token sitting in a tree while instar and qemu-img chew through 7.5 GiB of malicious images for two hours -- is gone either way.
  • The partition guard's YAML parsing is a hand-rolled text scan. True, and it has already bitten once: it discovered a prose comment as a CI job, recorded under "Bugs fixed during this work" above. Replacing the scan with a real parser is the right follow-up, and it is not a late change to a branch whose hardening already exceeds the change it hardens -- the same call as the refactor declined above, and for the same reason.

Bugs fixed during this work

  • A failed resparsify replaced a good image with a truncated one, and exited zero. Found by comparing the eight inline copies of the step before replacing them with a shared script. Six of the eight ran cp --sparse=always and mv as two unconditional statements, so a copy that failed part way -- ENOSPC being the realistic case on a 7.5 GiB tree -- was followed by an mv that moved the partial file over the original. The step then exited zero, because mv succeeded. The two newest copies had cp && mv and were correct. No copy propagated failure at all: find -exec does not fail on a non-zero child, and a while loop reports only its last command. The shared script takes the &&, adds the failure propagation neither form had, and its self-test asserts that an image survives a failed copy.
  • The partition guard was discovering a prose comment as a CI job, and the comment was one this branch added two commits earlier. The timing-seed explanation in functional-tests.yml contains the words "stestr run", which the guard's job discovery matched as an inline invocation; it then read the following prose as that job's selectors, giving it the bare words so, already, recorded and in. Those match a large slice of the suite, so the guard would have reported a genuinely orphaned test as claimed. Discovery now ignores matches inside YAML comments, with a regression test whose fixture carries the same shape of prose. Worth recording for how it was found: not by reading the guard, but by extending it and watching what it claimed to see.
  • The narrow resparsify skipped images the update's reset had just re-expanded. Found by review of the pull request, and nearly dismissed: the first measurement said git reset --hard leaves a stat-dirty entry alone, and it was wrong because it used the inode as the signal. Git overwrites an existing path in place, so the inode survives a rewrite and reports every file as untouched. With mtime as the signal and an unchanged, clean-stat control beside it, the opposite shows: the reset does rewrite an entry whose content is identical but whose index stat data is stale, and the disk build leaves exactly that state behind because resparsifying is a cp and a mv. Under LFS those files return fully allocated, and no diff of the two trees names them, so the narrow list missed them and the disk quietly gave back part of its saving. prepare-testdata.sh now unions the stat-dirty set into the list -- which costs nothing, the reset having already written them into the overlay -- and warns, because the real fix is a git update-index --refresh on the side that builds the disk. tools/ci/test-testdata-changed-files.sh pins all of it against a real git, including that the tree diff alone would have missed it.
  • A new test passed on this machine and had never once passed in CI. tools/ci/test-testdata-changed-files.sh builds local repositories with git init, and this developer has init.defaultBranch=main set where the runners leave it unset. On a runner the bare repository's HEAD therefore pointed at an unborn master while the push created main, and git clone reports that as "you appear to have cloned an empty repository" -- a warning, not an error -- so the script carried on and failed three assertions later with a confusing find: no such directory. Three rounds of review were reported with "gates green" on the strength of a local run; ci-tooling had been red since the commit that added the file, and the steps after it never ran at all. The test now neutralises GIT_CONFIG_GLOBAL and GIT_CONFIG_SYSTEM, pins every branch name explicitly, and checks the clone produced a tree at the point it clones rather than letting the failure surface downstream. The general lesson is narrower than "run CI": a test whose subject is a tool's behaviour must not inherit that tool's ambient configuration, because the developer's configuration is part of what it is measuring.
  • Otherwise none directly. #543 is not closed by this change.

Back brief

Two gates, both cheap to agree and expensive to redo:

  1. Before step 2 writes a selector, state the exact test ids moving to the nightly and wait for agreement. Everything downstream -- the nightly job, the guard, the documented exception -- is built on that list.
  2. Before step 3 commits to a workflow file, state whether the nightly lives in functional-tests.yml or its own file, and why.

Step 7 carries a third gate of a different kind: it is blocked on another team's interface, not on agreement here. If the Open questions are still unanswered when steps 1 to 6 are done, land those and take step 7 as a follow-up rather than holding the pull request -- the suite-side work is what closes the ejections, and the disk is worth 80 seconds of it.